Skip to main content
CityRuleLookup

Sarasota, FL Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing manual
Engineering Design Criteria Manual, readopted Ord. No. 24-5551
Who must comply
Multi-family, commercial, industrial, parking lots, all single-family homes
Review trigger
8+ new units, 1,500 sq ft addition, 50% value alteration
Certification validity
City engineer certification valid 1 year
Erosion permit
Required before grading; minor landscaping exempt
Review fees
Set by Resolution No. 99R-1196

Summary

New development in the City of Sarasota must meet the city's Engineering Design Criteria Manual (EDCM) for stormwater management under Sarasota City Code § 29.5-3. Multi-family, commercial, office and industrial projects and parking lots must satisfy the full EDCM and city Code; single-family homes and duplexes must still meet EDCM stormwater management design standards.

Sec. 29.5-3. - Compliance with city Code and engineering design criteria manual-Required. All multiple-family developments, commercial developments, professional office building developments, industrial developments, and parking lots shall comply with the applicable provisions of this Code and the engineering design criteria manual (EDCM). All single-family residential developments and duplexes shall comply with EDCM requirements for stormwater management design. ... Sec. 29.5-4(a). ... A certification by the city engineer that submitted plans comply with the criteria of this Code and the Engineering Design Criteria Manual (EDCM) shall be required as a condition precedent to the issuance of any building permit for construction of those structures described in subsections (1) through (7) below.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 33 | Zoning: Supplement 44).

Full Breakdown

5-2, most recently readopted by Ordinance No. 24-5551 on November 18, 2024. 5-3 requires every multiple-family, commercial, professional office, industrial development and parking lot to comply with applicable provisions of the city Code and the EDCM, and separately requires single-family homes and duplexes to meet the EDCM's stormwater management design standards even where they are exempt from full plan review. 5-4, site development plans for new subdivisions, developments adding eight or more dwelling units, multi-family structures, commercial, office and industrial buildings, and parking lots must be referred to the city engineer, whose written certification of EDCM compliance is a condition precedent to any building permit.

The same review applies to additions exceeding 1,500 square feet of gross floor area (or a cumulative 3,000 square feet over the prior ten years) and to alterations costing more than 50 percent of the structure's pre-alteration assessed value. Certification is valid for only one year; if construction has not begun by then, plans must be resubmitted. Individual single-family homes, duplexes and interior-only alterations fall outside this review track, though the city engineer may still require proof of code conformity before a permit issues. Review fees are set by Resolution No.

99R-1196. 5-8 requires an erosion and siltation control permit before any cutting, filling, grading or altering of natural topography, specifically to control sediment, protect the municipal storm sewer system and maintain watershed hydrology; minor landscaping and home maintenance are exempt, and the permit fee runs under Resolution No. 13R-2329.

Violations & Fines

Chapter 29.5 enforces compliance at the permit counter rather than through citations: the city engineer will not certify EDCM compliance, and no building permit or certificate of occupancy can issue, until submitted plans meet the manual's stormwater design criteria. Building multi-family, commercial or industrial improvements, or altering natural topography, without the required city engineer review under § 29.5-4 or an erosion and siltation control permit under § 29.5-8 is unlawful and blocks permitting until corrected.

Frequently Asked Questions

Do single-family homes in the City of Sarasota have to meet stormwater rules?
Yes. Sarasota City Code § 29.5-3 requires all single-family residential developments and duplexes to comply with the Engineering Design Criteria Manual's stormwater management design requirements, even though individual homes and duplexes are exempt from the broader city engineer plan-review process required for larger projects under § 29.5-4.
When does a City of Sarasota project need city engineer review before a building permit?
Under § 29.5-4, review is required for new subdivisions, developments adding eight or more dwelling units, multi-family buildings, commercial, office and industrial buildings, parking lots, and additions over 1,500 square feet (or 3,000 square feet cumulative over ten years). The city engineer's written EDCM certification is a condition precedent to the building permit.
Is a separate permit required to grade or alter land in the City of Sarasota?
Yes. Section 29.5-8 requires an erosion and siltation control permit from the city engineer before cutting, filling, grading or altering natural topography, to control sediment and protect the city's storm and sanitary sewer systems. Minor landscaping, home maintenance and emergency utility work are exempt from the permit requirement.

Sources & Official References

Other rules in Sarasota

All Sarasota rules

Florida rules heatmap·Compare Sarasota to another location·View the Florida environmental rules overview

Get notified when Stormwater Management in Sarasota, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Sarasota County handle stormwater management.

North Port, FL
Some Restrictions