Portland, ME Fence Regulations: Material Restrictions (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
§ 25-1, Chapter 25
Regulated material
Barbed wire fencing
Permit issuer
Building inspector
Permit type
Revocable
Scope
Fences along streets, ways, public places
Origin
Code 1968 § 703.8; Ord. 118-82

Summary

Portland's Code of Ordinances bars anyone from erecting or maintaining a barbed-wire fence along the line of a street, way, or public place without a revocable permit from the building inspector. The inspector may only issue that permit after finding the barbed wire will be installed and maintained so it adequately protects users of the adjoining street, way, or public place.

No fence of barbed wire, or of which barbed wire is a part, shall be erected or maintained along the line of any such streets, ways, or public places in the city without a revocable permit issued by the building inspector therefor. The city council may provide by order for a reasonable fee for such permit. No permit shall be issued unless the building inspector determines that such barbed wire will be erected and maintained in such a way as to adequately protect users of such streets, ways and public places.

View official code

Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.

Full Breakdown

Section 25-1, in Chapter 25 (Streets, Sidewalks and Other Public Places), covers any fence 'of barbed wire, or of which barbed wire is a part' that would sit 'along the line of any such streets, ways, or public places' in Portland. The rule doesn't ban the material outright, it makes barbed wire fencing along a public way unlawful unless the property owner first gets a revocable permit from the building inspector. The city council sets the permit fee by order, and the building inspector may issue the permit only after finding that the barbed wire 'will be erected and maintained in such a way as to adequately protect users of such streets, ways and public places', meaning the fence has to be installed and kept up so it doesn't create a hazard for pedestrians, cyclists, or anyone else using the adjoining public space.

Because the permit is revocable, the building inspector can pull it later if the barbed wire stops meeting that protective standard. 8) and was last amended by Ordinance No. 118-82 on August 2, 1982, so it predates the 2026 Land Use Code's dimensional fence standards, those newer height rules for residential lots in Table 9-B don't address barbed wire or electrified fencing at all, leaving Section 25-1 as Portland's only codified fence-material restriction. There is no companion provision in the General Ordinances or Land Use Code specifically restricting electric fencing.

Violations & Fines

Section 25-1 itself sets no standalone dollar fine: the enforcement mechanism is the permit itself: the building inspector will not issue one unless satisfied the barbed wire adequately protects users of the street, way, or public place, and the permit is expressly revocable, so the inspector can withdraw authorization if the fence stops meeting that standard. The chapter does not print a separate civil penalty schedule for this section.

Frequently Asked Questions

Can I put up a barbed-wire fence along my Portland property line?
Only along a street, way, or public place, and only if you first get a revocable permit from the building inspector under Section 25-1. The city council sets the permit fee by order, and the inspector can approve it only after finding the barbed wire will adequately protect users of the adjoining street or sidewalk.
Does Portland regulate electric fences?
No: a search of both the Land Use Code and the General Ordinances turns up no provision addressing electric or electrified fencing. Section 25-1 covers barbed wire specifically; electric fencing falls outside Portland's codified fence rules as of this code's 2026 revision.
Who issues the barbed-wire fence permit?
The building inspector, under Section 25-1. The permit is revocable, and the city council sets the fee for it by order rather than in the ordinance text itself, so check with the building inspector's office for the current amount before applying.

Sources & Official References

Other rules in Portland

All Portland rules

Compare Portland to another location·View the Maine fence regulations overview

Get notified when Material Restrictions in Portland, ME changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.