Burlington, WI Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- Permitting authority
- Building Inspector
- Fee
- Set by City Council
- Application needs
- Plat of survey, fence design
- Appeal path
- Zoning Board of Appeals
- Permit-free exceptions
- Invisible pet fences, temporary fences
Summary
Anyone building a fence in Burlington must first get a fence permit from the Building Inspector, with a fee set by the City Council, under Zoning Code § 315-51A. The application must include a plat of survey, fence design details, and site drawings.
The construction of a fence anywhere within the City of Burlington shall require application for a fence permit from the Building Inspector, the fee for which shall be in an amount set by the City Council. ... All fence materials shall be approved by the Building Inspector, who shall issue a fence permit upon application therefor for fences meeting the requirements of this section. If the Zoning Administrator denies a permit hereunder, the applicant may appeal the decision to the Zoning Board of Appeals, which may uphold, modify or overturn the Building Inspector's decision.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4997580; v29 updated 2026-07-07; through 07-07-2026).
Full Breakdown
Section 315-51A requires a fence permit application to the Building Inspector for the construction of a fence anywhere within the City of Burlington, with the permit fee set by the City Council rather than fixed in the code itself. When the fence is not already part of a landscaping plan, § 315-51B spells out what the application must include: the applicant's name and address, the site owner's and contractor's names, an accurate drawing or plat of survey of the site showing existing structures, the site address, the proposed fence location superimposed on that drawing, and the fence's type, materials, size, height, and design, plus anything else the Zoning Administrator requires.
Section 315-51D puts the Building Inspector in charge of approving fence materials and issuing the permit once the application meets the chapter's requirements; if the Zoning Administrator denies a permit, the applicant can appeal to the Zoning Board of Appeals, which may uphold, modify, or overturn the denial. Two categories are excused from the permit step: underground invisible pet fences, which § 315-51C(2)(c) allows without a permit as long as they sit at least three feet from all property lines, and temporary fences protecting new plantings or marking construction hazards, which § 315-51C(3) allows without a permit provided they are clearly visible or marked with warning devices every four feet and stay up no more than 45 days.
Violations & Fines
Constructing a fence in Burlington without first obtaining a permit from the Building Inspector under § 315-51A is a zoning violation enforced under § 315-136A, carrying a forfeiture of not less than $10 nor more than $200 plus prosecution costs per offense, with each day the unpermitted fence remains standing counted as a separate offense and possible county jail time of up to 30 days for nonpayment.
Frequently Asked Questions
Do I need a permit to build a fence in Burlington, Wisconsin?
What has to be in a Burlington fence permit application?
Is a permit required for an invisible pet fence in Burlington?
Sources & Official References
Other rules in Burlington
Compare Burlington to another location·View the Wisconsin fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.