Caddo Parish, LA Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- Permit required
- For all fences, new or repaired
- Maintenance duty
- Damaged sections must be fixed or removed
- Height measurement
- Ground to highest point; posts +6 inches
- Overriding rules
- Article 6/10 fence standards control when stricter
Summary
Every fence in unincorporated Caddo Parish needs a building permit before it goes up, and that includes repairing an existing fence, not just building a new one. The Unified Development Code also requires every fence and wall to be kept in good repair, with damaged or missing sections fixed, removed, or replaced.
1.General Requirementsa.All fences, including repair of existing fences, require a building permit.b.Every fence and wall must be maintained in a good repair and safe condition at all times. Every damaged or missing element must be repaired, removed, or replaced.c.Height is measured from the adjacent ground to the highest point, except that decorative posts of a fence or wall may exceed the maximum height by six inches.d.When fence requirements are a condition of a use or site element, such requirements control.e.When additional fence and wall requirements are found in the use standards of Article 6 or the landscape standards of Article 10, such requirements control.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 26 | Unified Development Code: Supplement 2).
Full Breakdown
UDC Section 7.3.L.1.a sets the baseline: 'All fences, including repair of existing fences, require a building permit.' That single line covers new construction and repairs alike, so replacing sections of a damaged fence triggers the same permit requirement as putting up a brand-new one; there is no small-project or minor-repair exemption written into this subsection. Section 7.3.L.1.b backs that up with an ongoing maintenance duty: 'Every fence and wall must be maintained in a good repair and safe condition at all times. Every damaged or missing element must be repaired, removed, or replaced,' so a permitted fence still has to be kept up once it's built.
The general requirements section also clarifies how the permit rule interacts with other parts of the Code. Height is measured from the adjacent ground to the highest point of the fence, except that decorative posts may exceed the district's maximum height by up to six inches without additional review. Where a fence is required as a condition of an approved use or site plan, or where the use standards in Article 6 or the landscape and screening standards in Article 10 add their own fence requirements, those more specific rules control over the general permit and design standards in Section 7.3.L. In practice, that means a fence required as landscape screening for a commercial site, for example, has to satisfy both the Article 10 screening standard and the Section 7.3.L building permit and construction requirements.
Violations & Fines
Building or repairing a fence without the required permit is a Zoning Administrator enforcement matter under UDC Article 19: the Administrator can order the fence brought into compliance or removed and can seek an injunction through the Parish Attorney if the owner refuses. Absent a UDC-specific fine, Code of Ordinances § 1-8 applies the parish default, up to 30 days in jail, a fine up to $500, or both, with each day the violation continues a separate offense.
Frequently Asked Questions
Do I need a permit to repair my existing fence?
Am I required to keep my fence in good repair?
Does a decorative fence post have to meet the height limit?
Sources & Official References
Other rules in Caddo Parish
Compare Caddo Parish to another location·View the Louisiana fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.