Troy, MI Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- Permit required
- Before any fence construction citywide
- Issuing office
- City of Troy Building Department
- Fee schedule
- Set under Chapter 60, Sec. 60.03
- Grading hold
- No permit until final lot grading approved
- Easement fences
- Need Director of Public Works approval first
- Height cap
- 6 ft rear/side, 30 in. in front yard
Summary
Troy requires a Building Department permit before any fence goes up. Chapter 83, Sec. 5 of the City Code makes construction without one unlawful, ties the fee to the Chapter 60 fee schedule, and blocks issuance until final lot grading is approved or, for fences in an easement, until the Director of Public Works signs off.
No fence shall be constructed until a permit for such construction has been obtained from the Building Department. Application for said permit shall contain such information as is necessary to determine if the proposed fence meets the requirements of this Ordinance and the Zoning Ordinance. The fee for said permit shall be in accordance with the Fee Schedule found within Section 60.03 of Chapter 60 of the Troy City Code. ... No permit shall be issued for any fence construction prior to the approval of the final lot grading for said lot where the fence is proposed. No permit shall be issued for any fence construction within any easement without the approval of the Director of Public Works, or his authorized representative.
Full Breakdown
Before installing, replacing, or extending a fence anywhere in Troy, the owner must obtain a permit from the Building Department under Chapter 83, Sec. 5 of the City Code. The application has to include enough detail (plans, dimensions, materials, and location) for staff to confirm the fence meets both the Fences chapter and the Zoning Ordinance. Permit fees run through the Fee Schedule in Chapter 60, Sec. 60.03, so the exact cost tracks whatever Council has set there rather than a flat number printed in Chapter 83 itself.
Two conditions can hold up issuance entirely. First, the Building Department will not issue a fence permit until final lot grading has been approved for that lot, so on new construction the grading sign-off has to come before the fence goes in. Second, any fence proposed inside an easement needs the separate approval of the Director of Public Works (or an authorized representative) before a permit can issue, since a fence over a buried utility line can block maintenance access.
The permit sits alongside the chapter's construction standards read in the same pass: residential fences are capped at six feet along rear and side lines and thirty inches in the front-setback area (forty-eight inches on qualifying corner lots with a common rear-yard relationship), electrically charged fences are banned citywide, and barbed wire is barred in residential districts except to guard against an attractive nuisance, where it must clear six feet above grade. An owner who wants to exceed the height limits can ask the Building Board of Appeals for a waiver, which is a separate approval from the base construction permit.
Violations & Fines
Chapter 83 does not carry its own fine schedule. The Building Department enforces it by withholding or revoking approvals: a fence built without a permit, over height, electrified, using barbed wire in a residential yard, or placed in an easement without Public Works sign-off can be ordered modified or removed until it conforms. Grading and easement holds are enforced at the application stage, before any permit is issued.
Frequently Asked Questions
Do I need a permit to install a fence in Troy?
Can I put a fence in a utility easement on my lot?
Why would my fence permit be delayed?
How tall can my fence be without extra approval?
Sources & Official References
Other rules in Troy
Compare Troy to another location·View the Michigan fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.