Warren, MI Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- Permit required
- Before any fence or wall is built
- Issuing office
- Division of Buildings and Safety Engineering
- Fee basis
- Charged per lineal foot of fence
- Application needs
- Plot plan showing type, size, location
- Exempt fences
- Temporary event, snow, public-property, construction fencing
- Civil infraction fine
- $100 to $1,000 per violation, Code § 1-8
Summary
Before erecting any fence or wall in Warren, owners must obtain a permit from the Division of Buildings and Safety Engineering under Zoning Ordinance Section 4D.03. The application needs a plot plan showing the fence's type, size and location, and the permit fee is charged per lineal foot of fence. A handful of temporary and construction fences are exempt under Section 4D.04.
It shall be unlawful for any person to construct or erect any fence or wall upon any property within the city without first having obtained a permit from the division of buildings and safety engineering. The permit application shall be accompanied by a plot plan showing the type, size and proposed location of the fence and payment of the permit fee established by resolution adopted by city council. The fee shall be based on the lineal foot of fence to be installed.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 102).
Full Breakdown
03 backs that compliance duty with a hard permit gate: no one may construct or erect a fence or wall anywhere in the city without first obtaining a permit from the Division of Buildings and Safety Engineering. The permit application must be accompanied by a plot plan showing the fence's type, size and proposed location, along with payment of a permit fee set by City Council resolution and calculated per lineal foot of fence installed, so a longer run of fence costs more to permit than a short one.
04 carves out four permit exemptions: temporary fences tied to a city-approved special event, temporary winter snow fences, fences built on public property, and temporary construction fences protecting excavation sites, though the excavation-fencing exemption expires after one year unless the Zoning Board of Appeals grants special approval to keep it longer. 05, but they cannot be enlarged or altered beyond what the original permit described, and any repair or replacement must bring them into full compliance. Enforcement runs through the city's zoning inspector, who under Section 1-9(c)(3)(b) of the general Code has authority to issue appearance tickets for zoning ordinance violations, including unpermitted fence construction.
Violations & Fines
Building or altering a fence without the Section 4D.03 permit is a zoning violation the city's zoning inspector can cite by appearance ticket. Under the Code's general penalty section, § 1-8, a municipal civil infraction carries a fine of at least $100 and up to $1,000 per violation plus court costs, and each day the unpermitted fence remains is a new, separate offense the city may also abate as a nuisance.
Frequently Asked Questions
Do I need a permit to put up a snow fence in Warren?
What does the fence permit fee depend on?
Can I keep an old fence that doesn't meet current rules?
Sources & Official References
Other rules in Warren
Compare Warren to another location·View the Michigan fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Fence Permit Requirements in Nearby Cities
How other cities in Macomb County handle fence permit requirements.