St. Petersburg, FL Fence Regulations: Retaining Walls (2026)
Key Facts
- Standard height cap
- 18 in. above grade
- Waterfront wall height
- No higher than existing seawall
- Permit required
- Yes, from the POD (§ 7-38)
- Engineering standards
- On file with City engineering dept.
- Setback
- To property line/seawall (height-limited)
Summary
St. Petersburg caps most retaining walls at 18 inches above grade under the zoning encroachment table, and requires a separate POD construction permit for any seawall, bulkhead, retaining wall or rock revetment before work begins, per City Code § 7-38.
Before the construction or alteration of any seawall, bulkhead, retaining wall, or rock revetments, or before the placement of rip-rap or any part thereof, a permit therefor shall be obtained from the POD. ... The permit shall be issued upon a finding that the proposed activity will not violate any law, ordinance, rule or regulation and will not endanger the public health and safety. All seawalls, bulkheads, retaining walls, rock revetments, and rip-rap, constructed or altered shall be constructed in compliance with the minimum standards and specifications therefor established by and on file in the City engineering department.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 54).
Full Breakdown
Two St. Petersburg City Code provisions govern retaining walls. ' On a waterfront lot, a retaining wall may go to the property line or seawall, but its height cannot exceed the top of the existing seawall, and the table notes federal and state regulations may be more restrictive. Separately, chapter 7 of the Code, Boats, Beaches and Waterways, requires an actual construction permit: § 7-38 states that before the construction or alteration of any seawall, bulkhead, retaining wall or rock revetment, or before the placement of rip-rap, a permit must be obtained from the POD.
The applicant must submit detailed specifications showing the structure's location relative to adjoining land, water and channels, plus any plans the POD reasonably requires; the POD issues the permit on a finding that the work will not violate any law or endanger public health and safety, and every seawall, bulkhead, retaining wall, rock revetment or rip-rap must meet the minimum engineering standards and specifications the City engineering department keeps on file. Section 7-39 separately makes it unlawful to maintain a retaining wall that impedes boat traffic, creates a swimming hazard, or endangers adjacent structures.
Violations & Fines
Constructing or altering a seawall, bulkhead, retaining wall or rock revetment without the § 7-38 POD permit, or exceeding the 18-inch height cap in § 16.60.050.2, is a Code violation. Under § 1-7(c), a conviction carries a fine up to $500.00, up to 60 days imprisonment, or both, with each day a continuing violation persists treated as a separate offense.
Frequently Asked Questions
How tall can a retaining wall be in St. Petersburg?
Do I need a permit to build a retaining wall?
What engineering standards apply to a retaining wall?
Can the City require me to fix a failing retaining wall?
Sources & Official References
Other rules in St. Petersburg
Florida rules heatmap·Compare St. Petersburg to another location·View the Florida fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.