Skip to main content
CityRuleLookup

Brentwood, CA Filming & Production: Location Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Film location permits in Brentwood, CA, sometimes called film shoot permits, production permits, or filming authorizations, cover commercial photography, video shoots, and motion picture production.

Key Facts

Governing section
BMC § 17.850.007(D)
Permit type
Temporary use permit
Reviewing official
Community development director
Max duration
Up to 12 months
Required
Insurance certificate and performance bond

Summary

Filming a commercial, movie, or video at a specific Brentwood site requires a temporary use permit under Municipal Code Section 17.850.007(D), reviewed administratively by the community development director. The permit can run for up to twelve months, and the underlying temporary use permit requirement in Section 17.850.004 makes filming without one unlawful.

A temporary use shall not be conducted, established, or operated in any manner without the approval and maintenance of a valid temporary use permit in compliance with this chapter, unless otherwise exempt under the provisions of this chapter. ... ... D. Location Filming. The temporary use of a specific site for the location filming of commercials, movies, videos, etc., for the time specified by the community development director, but not to exceed twelve months.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4604307; v5 updated 2025-12-09).

Full Breakdown

Location filming is one of the specific 'allowed temporary uses' the Brentwood community development director can authorize under Municipal Code Section 17.850.007(D), covering the temporary use of a site for filming commercials, movies, videos, and similar productions. Because a temporary use permit is required before any temporary use begins, per Section 17.850.004, a production company has to file an application and get administrative approval before filming on a specific site, and the director sets the length of the authorization case by case, capped at twelve months by Section 17.850.007's opening paragraph.

Section 17.850.005 puts the review in the hands of the community development director, who decides without a public hearing unless the application is referred to the planning commission; the director's decision is final subject to appeal under Chapter 17.880. Section 17.850.010 requires every temporary use permit, filming included, to carry a certificate of insurance acceptable to the city's risk manager, a performance bond or other surety to guarantee removal of any temporary equipment and restoration of the site, and a signed statement agreeing to indemnify the city against claims arising from the production. Section 17.850.009 layers on development standards covering access, parking and vehicle ingress and egress, and regulation of nuisance factors such as dirt, dust, glare, light, noise, odors, smoke, and vibration generated by the shoot.

The community development director can revoke or modify a filming permit under Section 17.850.011 if the production stops complying with the conditions of approval, or if the permit was obtained through misrepresentation.

Violations & Fines

Filming at a location within Brentwood without an approved temporary use permit violates Section 17.850.004, which bars any temporary use from being conducted, established, or operated without one. The community development director can revoke or modify an issued filming permit under Section 17.850.011 for noncompliance with its conditions or for misrepresentation used to obtain it, and the site must be restored and cleared of debris once filming ends under Section 17.850.010(D).

Frequently Asked Questions

Do I need a permit to film a commercial in Brentwood?
Yes. Location filming is listed as an allowed temporary use under Municipal Code Section 17.850.007(D), and Section 17.850.004 requires a valid temporary use permit before any temporary use, including filming, can be conducted anywhere in the city. The community development director reviews and approves the application administratively.
How long can a Brentwood filming permit last?
The community development director sets the length of a location filming permit based on the production's needs, but Section 17.850.007 caps every temporary use permit, filming included, at twelve months. Productions that need more time have to reapply rather than receive an automatic extension beyond that ceiling.
What conditions come with a filming location permit?
Section 17.850.010 requires a certificate of insurance acceptable to the city's risk manager, a performance bond or similar surety to guarantee site restoration, and a signed indemnification statement protecting the city from claims tied to the shoot. Section 17.850.009 also lets the city regulate parking, noise, dust, light, and other nuisance factors the production creates.

Sources & Official References

Other rules in Brentwood

All Brentwood rules

California rules heatmap·Compare Brentwood to another location·View the California filming & production overview

Get notified when Location Permits in Brentwood, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Location Permits in Nearby Cities

How other cities in Contra Costa County handle location permits.

San Ramon, CA
Some Restrictions