Norfolk, VA Filming & Production: Location Permits (2026)
Film location permits in Norfolk, VA, sometimes called film shoot permits, production permits, or filming authorizations, cover commercial photography, video shoots, and motion picture production.
Key Facts
- Application deadline
- At least 14 days before filming
- Standard fee
- $100 ($50 if city-based)
- Fee waiver
- Waived for student/nonprofit filming
- Exempt filming
- News coverage, nonprofit documentaries
- Violation penalty
- Class 2 misdemeanor
- Insurance
- City named as additional insured
- Adopted
- Ord. No. 36,924, July 14, 1992
Summary
Filming on any Norfolk street, park, or other public property requires a city manager permit under Code § 29-68.1, applied for at least 14 days ahead, except for news coverage of current events or nonprofit documentaries. The city can deny a permit that would tie up traffic, drain police staffing, or block fire access.
(a) No person, firm or corporation shall engage in any filming activity in or upon any street, way, highway, road, parkway or other public property; or parcel unless the city manager has granted a permit for such filming, provided that a permit shall not be required for news coverage of contemporaneous events or documentaries not for profit. (b) A written application for a permit pursuant to this section, on a form prescribed by the city manager, shall be filed with the city manager or his designee no less than fourteen (14) days prior to the date on which filming is desired to begin. ... (d) The permit application must be accompanied by a processing fee of one hundred dollars ($100.00), provided, however that the fee shall not be required for student or non-profit filming activities, and that the fee will be fifty dollars ($50.00) for applicants whose principal place of business is in the city. ... (h) Any person, firm or corporation violating any of the provisions of this section shall be guilty of a Class 2 misdemeanor.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 166).
Full Breakdown
Norfolk Code § 29-68.1(a) requires anyone filming in or upon a street, way, highway, road, parkway, or other public property or parcel to first get a permit from the city manager. News crews covering contemporaneous events and nonprofit documentary crews are exempt from the permit requirement entirely. Everyone else files a written application on the city manager's prescribed form at least 14 days before filming is set to begin, though the city manager can shorten that window for a short or limited-scope shoot.
The application under subsection (c) must list the applicant's name and address, the incorporation state and registered agent if the applicant is a corporation, the exact dates and hours requested, the specific filming locations, any planned street obstructions, unusual parking needs, or police/traffic-control requests, portions of the shooting script and location schedule, and details of any stunts, chase scenes, or special effects planned at each location. Under subsection (d), the application must include a $100 processing fee, cut to $50 for applicants whose principal place of business is in the city, though the fee is waived entirely for student and nonprofit filming activities.
Subsection (e) lets the city manager refuse a permit outright if the filming would substantially interrupt traffic that cannot be reasonably rerouted, would divert so many police officers or city staff that normal city obligations suffer, would let crowds or vehicles interfere with fire or police protection or ambulance access to nearby areas, or would block firefighting equipment responding to a fire. Under subsection (f), an approved permit also requires the applicant to carry liability insurance naming the city as an additional insured and to post an advance deposit or letter of credit covering the city's estimated service costs.
Filming without the required permit, or violating a condition once one is issued, is a Class 2 misdemeanor under subsection (h). The rule was enacted by Ord. No. 36,924 on July 14, 1992.
Violations & Fines
Filming in a covered public location without a permit, or violating a permit condition, is a Class 2 misdemeanor under § 29-68.1(h). The city manager can also refuse to issue a permit outright for a proposed shoot that would tie up traffic, overload police staffing, or block fire and ambulance access.
Frequently Asked Questions
Do I need a permit to film on a Norfolk street or in a park?
How far in advance do I need to apply for a Norfolk filming permit?
How much does a Norfolk filming permit cost?
Can Norfolk deny a filming permit?
Sources & Official References
Other rules in Norfolk
Compare Norfolk to another location·View the Virginia filming & production overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.