Skip to main content
CityRuleLookup

Roseville, CA Filming & Production: Location Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Film location permits in Roseville, CA, sometimes called film shoot permits, production permits, or filming authorizations, cover commercial photography, video shoots, and motion picture production.

Key Facts

Standard filing deadline
2 business days ahead
Street closure/stunt filing
10 business days ahead
Traffic control over 3 min
4 working days ahead
Permit issued by
Film permit coordinator
Appeal deadline
5 business days to city manager

Summary

Anyone filming on Roseville public property, streets, parks, or city buildings needs a film permit from the film permit coordinator before shooting begins. Municipal Code Sec. 6.08.030 makes filming without one unlawful, and the permit must stay in the permittee's possession on location at all times.

It is unlawful to conduct a filming activity as defined in Section 6.08.020(C) on public property within the city without first obtaining a film permit from the film permit coordinator. The film permit must be in the possession of the permittee at all times while on location in the city.

Full Breakdown

Applicants must file with the film permit coordinator at least two business days before shooting begins; activities needing more than three minutes of traffic control require four working days' notice, and any filming with street closures, stunts, or pyrotechnics needs ten business days' advance notice (Sec. 050). The coordinator can still accept a late application on a showing of good cause if there is time to process it. 08 exempts news filming, filming for a criminal investigation or court proceeding, non-commercial private or family filming, small still-photography shoots that stay off city property and park no more than two vehicles on a public street, and filming done by or for the city or a public-access channel, so long as none of those activities closes a city street or substantially blocks traffic (Sec.

040). The application must list the applicant's and on-site contact's names and phone numbers, the filming locations, dates and call times, a description of the scenes including any firearms, explosives, open flame, animals, amplified noise, stunts, or moving vehicles, watercraft or aircraft, the number of vehicles to be parked on public streets, and proof of insurance (Sec. 060). The coordinator must deny a permit that would substantially disrupt traffic or emergency access, interfere with scheduled street work or another authorized permit, endanger the public, disrupt residents' privacy or peace, or was filed with false information (Sec. 070).

Violations & Fines

Filming on Roseville public property without a permit is unlawful under Sec. 6.08.030. The film permit coordinator can revoke a permit for noncompliance or false statements, and a Roseville police officer can suspend it on-site if the activity poses an immediate hazard the location manager will not fix (Sec. 6.08.150). Revocation or suspension notices are written, and a permittee has five business days to appeal to the city manager (Sec. 6.08.160).

Frequently Asked Questions

How far ahead must I apply for a Roseville film permit?
At least two business days before filming for a standard shoot, four working days if traffic control will run longer than three minutes, and ten business days if the shoot involves a street closure, stunts, or pyrotechnics, per Sec. 6.08.050. The coordinator waives the deadline only for good cause with enough time left to process the request.
Does every film shoot in Roseville need a permit?
No. Sec. 6.08.040 exempts news coverage, filming for a criminal or civil court matter, private or family filming, and small still-photography shoots that stay off city property and park no more than two vehicles on a public street, provided none of those activities closes a street or substantially blocks traffic.
Who reviews and can deny a Roseville film permit?
The film permit coordinator reviews every application and must deny it if the shoot would disrupt traffic or emergency access, interfere with scheduled street work, endanger the public, disturb residents' peace, or contains false information, under Sec. 6.08.070.

Sources & Official References

Other rules in Roseville

All Roseville rules

California rules heatmap·Compare Roseville to another location·View the California filming & production overview

Get notified when Location Permits in Roseville, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.