Skip to main content
CityRuleLookup

San Diego County, CA Fire Regulations: Brush Clearance (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Defensible space
100 feet around improvements (Sec. 68.404)
Minimum allowed
Not less than 30 feet (Fire Warden)
Property-line clearance
30 feet where neighbor endangered
Road/driveway clearance
10 feet each side of improved width
Weed/grass height
Max 6 inches
Enforcement
Public nuisance abatement (Sec. 68.405)

Summary

Unincorporated San Diego County requires 100 feet of defensible space around structures under the Defensible Space for Fire Protection Ordinance (County Code Ch. 4, Div. 8, Title 6). Combustible vegetation, dead trees, and rubbish must be cleared within 100 feet of improvements, 30 feet of property lines, and 10 feet of roads. Violations are a public nuisance.

City-specific rules exist: Escondido, El Cajon, Bostonia, Encinitas, Chula Vista, Carlsbad, Oceanside, San Diego, Vista, and San Marcos have their own brush clearance rules that differ from San Diego County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

99] ( Chapter 3 added by Stats. 1965, Ch. 1144. ) 4291. (a) A person who owns, leases, controls, operates, or maintains a building or structure in the state responsibility area shall at all times do all of the following: (1) (A) Maintain defensible space of 100 feet from each side and from the front and rear of the structure, but not beyond the property line, except as provided in subparagraph (B). The amount of fuel modification necessary shall consider the flammability of the structure as affected by building material, building standards, location, and type of vegetation. Fuels shall be maintained and spaced in a condition so that a wildfire would be unlikely to ignite the structure.

Source: County Defensible Space InfoView official code

Full Breakdown

Unincorporated San Diego County enforces strong defensible-space rules through the Defensible Space for Fire Protection Ordinance (San Diego County Code, Chapter 4 of Division 8 of Title 6, Secs. 406, adopted by Ordinance No. 10147). Under Sec. 404(a), no responsible party may permit accumulation of combustible vegetation, dead/dying/diseased trees, green waste, rubbish, or other flammable materials within 100 feet of the exterior perimeter of any improvement; the Fire Warden may reduce this to no less than 30 feet, or require up to property line where the parcel is smaller.

Sec. 404(b) requires clearance within 30 feet of property lines where accumulation endangers a neighbor's defensible space, and Sec. 404(c) requires clearing within 10 feet of each side of the improved width of roads and driveways. In high-risk areas (such as the MSCP Subarea), the Fire Warden may require up to 2 to 5 acres of additional clearance (Sec. 404(d)). Approved removal methods (Sec. 406) leave root structure intact to prevent erosion, keep weeds and grasses under 6 inches, and cut tree stumps no higher than 8 inches.

The ordinance applies in unincorporated territory outside fire/water districts (administered by the Fire Warden), or within districts that have adopted it. This implements California Public Resources Code section 4291, the statewide 100-foot defensible-space requirement.

Violations & Fines

Allowing combustible vegetation or debris to accumulate in violation of Sec. 68.404 is declared a public nuisance under Sec. 68.405. The Fire Warden may abate it under the County's Public Nuisance Abatement Procedure (Code Sec. 16.201 et seq.), with abatement costs and liens charged to the property owner.

Frequently Asked Questions

How much defensible space is required around my home?
County Code Sec. 68.404(a) requires clearing combustible vegetation, dead trees, and debris within 100 feet of any improvement. The Fire Warden may reduce this to no less than 30 feet, or to your property line if the parcel is smaller. This matches state law (PRC section 4291).
What happens if I don't clear my brush?
Under Sec. 68.405, the accumulation is declared a public nuisance. The Fire Warden can order abatement under the County's Public Nuisance Abatement Procedure (Sec. 16.201 et seq.), and the cost of clearing the property can be charged to the owner and placed as a lien.

Sources & Official References

Other rules in San Diego County

All San Diego County rules

California rules heatmap·Compare San Diego County to another location·View the California fire regulations overview

Get notified when Brush Clearance in San Diego County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Brush Clearance in Cities Across San Diego County