Hercules, CA Fire Regulations: Wildfire Zones (2026)
Key Facts
- Adopted code
- 2025 CA Wildland-Urban Interface Code, Part 7
- Adopting ordinance
- County Ord. 2025-15, approved Dec. 9, 2025
- Companion fire code
- 2025 CA Fire Code, Part 9 (Ord. 2025-14)
- Statutory basis
- Govt. Code §§ 50020-50022.9
- Unpermitted work penalty
- Double fee under HMC § 9-1.03
Summary
Hercules applies statewide wildfire-zone construction standards through Section 9-3.01 of the Municipal Code, which adopts the 2025 California Wildland-Urban Interface Code (Part 7) by reference via Contra Costa County Ordinance No. 2025-15, approved December 9, 2025. The same section separately adopts the 2025 California Fire Code (Part 9) via a companion county ordinance.
The provisions of County Ordinance No. 2025-15, approved by the Contra Costa Board of Supervisors acting in its capacity as the Board of Directors of the Crockett- Carquinez Fire Protection District and the Contra Costa County Fire Protection District adopted on December 9, 2025, adopting the 2025 California Wildland-Urban Interface Code (Part 7) with changes, additions, and deletions, are adopted by reference under the authority of California Government Code Sections 50020 through 50022.9.
Full Breakdown
Hercules folds its wildfire-zone construction standards into the same Building Standards Code chapter that adopts the rest of Title 24. Section 9-3.01 incorporates the 2025 California Wildland-Urban Interface Code, Part 7 of Title 24, through Contra Costa County Ordinance No. 2025-15. The Board of Supervisors approved that ordinance on December 9, 2025, sitting in the dual capacity of the Board of Directors of both the Crockett-Carquinez Fire Protection District and the Contra Costa County Fire Protection District, and the adoption runs under the same statutory authority, California Government Code Sections 50020 through 50022.9, that lets a city adopt a county's technical codes by reference rather than write its own.
The WUI Code adoption sits alongside a companion fire-code adoption in the same section: County Ordinance No. 2025-14, approved by the same fire district boards on November 18, 2025, brings in the 2025 California Fire Code, Part 9, with its own local changes, additions and deletions. Together the two ordinances set the construction and fire-protection requirements that apply once a parcel falls inside a state-mapped wildfire hazard area, covering exterior wall assemblies, vent screening and similar features on new construction and qualifying alterations.
Because these are Title 9 technical codes, they run through the same administrative machinery as every other building permit in Hercules: Section 9-1.02 routes plan review and inspection to the Contra Costa County building official under the City's inspection services contract, Section 9-1.03 doubles the permit fee for work started before the permit issues, and a disputed WUI Code determination can be appealed to the three-member Board of Appeals within ten days under Section 9-2.09.
Violations & Fines
Building in a wildfire hazard area without complying with the adopted WUI Code standards is enforced the same way as any other Title 9 violation: an infraction by default, or a misdemeanor if the City elects to prosecute, under Section 9-1.03. Starting exterior-assembly or vent work before the permit issues carries the same double permit-fee penalty that applies to every other technical code Hercules has adopted by reference.
Frequently Asked Questions
What wildfire construction code applies in Hercules?
Who approved Hercules' wildfire building code?
Does the wildfire code adoption cover fire code requirements too?
Sources & Official References
Other rules in Hercules
California rules heatmap·Compare Hercules to another location·View the California fire regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Wildfire Zones in Nearby Cities
How other cities in Contra Costa County handle wildfire zones.