Bartow County, GA Hurricane Preparedness: Flood Elevation (2026)
Key Facts
- Enforcing agency
- Bartow County Engineering Department
- Elevation standard
- 3 ft above BFE or 1 ft above future-conditions elevation
- Civil penalty
- Up to $1,000 per day per violation
- Criminal penalty
- $500-$1,000 fine, up to 60 days jail
- Appeal deadline
- 30 days to board of appeals
- Governing chapter
- Bartow County Code Ch. 34, Div. 6
Summary
In unincorporated Bartow County, new construction and substantial improvements inside the future-conditions floodplain must be anchored against flotation, built with flood-resistant materials, and have HVAC, electrical, plumbing and other service equipment elevated three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. The county engineer administers Chapter 34's flood damage reduction standards and enforces them with civil and criminal penalties.
(6)All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher, so as to prevent water from entering or accumulating within the components during conditions of flooding;
Full Breakdown
Chapter 34, Division 6 of the Bartow County Code sets the building standards that apply once a structure has cleared the development restrictions in sections 34-78 through 34-80. New construction and substantial improvements of principal buildings, including manufactured homes, must be anchored to prevent flotation, collapse or lateral movement, built with materials resistant to flood damage, and constructed using methods that minimize flood damage. Enclosed areas below the lowest floor, such as crawl spaces used for parking or storage, must have flood vents providing at least one square inch of net opening per square foot of enclosed area, with the bottom of every opening no higher than one foot above grade.
Mechanical, electrical, plumbing and ventilation equipment must sit at least three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. Manufactured homes must be anchored with over-the-top or frame ties to ground anchors, and water and sewer systems must be designed to keep floodwater from infiltrating them. Where a site spans more than one flood zone, the more restrictive elevation standard controls. The county engineer, acting as administrator under section 34-64, reviews permit applications, records finished-floor elevations and interprets floodplain boundary disputes.
Anyone contesting a determination can appeal to the board of appeals within 30 days under section 34-102, and the board can grant variances under section 34-103 for hardship, historic structures or functionally dependent uses, though never within a designated floodway if it would raise flood levels.
Violations & Fines
Violating Chapter 34's floodplain standards draws a written notice of violation, a stop work order, and withholding of building permits or certificates of occupancy until the property is brought into compliance. The county engineer can impose civil penalties up to $1,000.00 per day the violation continues, and criminal citations carry a mandatory minimum fine of $500.00, a maximum of $1,000.00, and up to 60 days in jail, with each day a separate offense under section 34-112.
Frequently Asked Questions
Who enforces Bartow County's flood elevation rules?
How high above base flood elevation must equipment sit?
Can a property owner appeal a floodplain determination?
What happens if construction violates the flood standards?
Sources & Official References
Other rules in Bartow County
Compare Bartow County to another location·View the Georgia hurricane preparedness overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.