Key Facts

Enforcing agency
Bartow County Engineering Department
Elevation standard
3 ft above BFE or 1 ft above future-conditions elevation
Civil penalty
Up to $1,000 per day per violation
Criminal penalty
$500-$1,000 fine, up to 60 days jail
Appeal deadline
30 days to board of appeals
Governing chapter
Bartow County Code Ch. 34, Div. 6

Summary

In unincorporated Bartow County, new construction and substantial improvements inside the future-conditions floodplain must be anchored against flotation, built with flood-resistant materials, and have HVAC, electrical, plumbing and other service equipment elevated three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. The county engineer administers Chapter 34's flood damage reduction standards and enforces them with civil and criminal penalties.

These county ordinances apply to unincorporated areas of Bartow County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(6)All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher, so as to prevent water from entering or accumulating within the components during conditions of flooding;

Full Breakdown

Chapter 34, Division 6 of the Bartow County Code sets the building standards that apply once a structure has cleared the development restrictions in sections 34-78 through 34-80. New construction and substantial improvements of principal buildings, including manufactured homes, must be anchored to prevent flotation, collapse or lateral movement, built with materials resistant to flood damage, and constructed using methods that minimize flood damage. Enclosed areas below the lowest floor, such as crawl spaces used for parking or storage, must have flood vents providing at least one square inch of net opening per square foot of enclosed area, with the bottom of every opening no higher than one foot above grade.

Mechanical, electrical, plumbing and ventilation equipment must sit at least three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. Manufactured homes must be anchored with over-the-top or frame ties to ground anchors, and water and sewer systems must be designed to keep floodwater from infiltrating them. Where a site spans more than one flood zone, the more restrictive elevation standard controls. The county engineer, acting as administrator under section 34-64, reviews permit applications, records finished-floor elevations and interprets floodplain boundary disputes.

Anyone contesting a determination can appeal to the board of appeals within 30 days under section 34-102, and the board can grant variances under section 34-103 for hardship, historic structures or functionally dependent uses, though never within a designated floodway if it would raise flood levels.

Violations & Fines

Violating Chapter 34's floodplain standards draws a written notice of violation, a stop work order, and withholding of building permits or certificates of occupancy until the property is brought into compliance. The county engineer can impose civil penalties up to $1,000.00 per day the violation continues, and criminal citations carry a mandatory minimum fine of $500.00, a maximum of $1,000.00, and up to 60 days in jail, with each day a separate offense under section 34-112.

Frequently Asked Questions

Who enforces Bartow County's flood elevation rules?
The Bartow County Engineering Department, through the county engineer acting as ordinance administrator, reviews permits, records elevation certifications and issues notices of violation and stop work orders for noncompliant construction in the future-conditions floodplain under Chapter 34, Division 6 of the Bartow County Code.
How high above base flood elevation must equipment sit?
HVAC, electrical, plumbing and other service equipment must be installed at least three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever produces the higher elevation, under section 34-91(6) of the Bartow County Code.
Can a property owner appeal a floodplain determination?
Yes. Any person aggrieved by a county engineer decision may file a written notice of appeal within 30 days, and the board of appeals established under the Bartow County Zoning Ordinance will hold a hearing and issue a written decision within ten days.
What happens if construction violates the flood standards?
The county engineer can issue a stop work order, withhold permits, and assess civil penalties up to $1,000 per day; criminal citations carry a mandatory minimum $500 fine, a maximum of $1,000, and up to 60 days in jail per section 34-112 of the Bartow County Code.

Sources & Official References

Other rules in Bartow County

All Bartow County rules

Compare Bartow County to another location·View the Georgia hurricane preparedness overview

Get notified when Flood Elevation in Bartow County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.