Key Facts

Elevation datum
Stated in relation to mean sea level
Who certifies
Licensed professional engineer or land surveyor
When due
After lowest floor is placed or floodproofing completed
Manufactured homes
Certificate required upon placement on site
Recreational vehicles
Certificate needed if on-site 180+ consecutive days
Building before approval
Undertaken entirely at owner's own risk

Summary

Before Colonie's PEDD Director will issue a floodplain development permit for new or substantially improved construction in Zones A1-A30, AE, or AH, the applicant must state the proposed elevation of the lowest floor, including any basement or cellar, in relation to mean sea level. Once that floor is in place, a licensed engineer or surveyor must certify the as-built elevation before the project can move forward.

The proposed elevation, in relation to mean sea level, of the lowest floor (including basement or cellar) of any new or substantially improved structure to be located in Zones A1-A30, AE or AH, or Zone A if base flood elevation data are available. Upon completion of the lowest floor, the permittee shall submit to the Director of the PEDD or his/her designee the as-built elevation, certified by a licensed professional engineer or surveyor.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4902401; v37 updated 2026-05-28; through 05-28-2026).

Full Breakdown

This elevation-certification duty runs through the whole build. For nonresidential projects that will be floodproofed instead of elevated, the applicant must submit the proposed floodproofed elevation up front and, on completion, a certificate from a licensed engineer or architect confirming the as-built floodproofed elevation and that utility floodproofing meets § 190-100B(3). Manufactured homes need a certification upon placement on the site, and a recreational vehicle needs one too if it stays on a lot 180 consecutive days or longer without being licensed and ready for highway use.

In Zone A, where no base flood elevation data exist, any subdivision or development proposal greater than 50 lots or five acres must supply its own base flood elevation data with the application, and the Director may require a technical analysis by a licensed professional engineer showing whether the project could damage neighboring property. The Director keeps every elevation certification, floodproofing certificate, floodplain permit, and certificate of compliance on file for inspection, and relies on them, together with hydraulic data and encroachment analyses, to decide whether a certificate of compliance can issue.

Violations & Fines

Any further work undertaken before the Director approves the submitted certification is entirely at the permit holder's risk. If the Director's review turns up a deficiency in the elevation data, that is cause to issue a stop-work order unless it is corrected immediately, and disregarding a stop-work order carries the same penalty as building without a permit: a fine of no more than $250 or up to 15 days in jail, with each day of noncompliance counted separately under § 190-98E.

Frequently Asked Questions

What elevation information must I submit before building in a Colonie flood zone?
The proposed elevation, in relation to mean sea level, of the lowest floor, including any basement or cellar, for the specific flood zone the lot sits in. The Director of the PEDD uses this figure to decide whether the floodplain development permit application meets Article XVII before construction starts.
When is the as-built elevation certificate due?
The certificate is due once the lowest floor is placed, or the floodproofed portion of a nonresidential structure is finished. A licensed professional engineer or land surveyor must prepare and certify it before you can keep building toward occupancy.
Who can certify the elevation on a Colonie flood-zone project?
A licensed professional engineer or a land surveyor certifies the as-built lowest-floor elevation on a residential project. For nonresidential floodproofing work, the certifying professional may instead be a licensed engineer or architect, as § 190-99C(3) and (4) both specify for utility and structural floodproofing certificates.
What if I keep building before the certificate is approved?
Any work you complete before the Director of the PEDD approves your submitted elevation certification is entirely at your own risk under § 190-99D(4)(b). If the Director's review finds a deficiency in the data, that is grounds for a stop-work order on the project unless you correct it right away.

Sources & Official References

Other rules in Colonie

All Colonie rules

New York rules heatmap·Compare Colonie to another location·View the New York hurricane preparedness overview

Get notified when Flood Elevation in Colonie, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation in Nearby Cities

How other cities in Albany County handle flood elevation.

Albany, NY
Some Restrictions