Jackson, MS Hurricane Preparedness: Flood Elevation (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Lowest floor reference
Centerline of designated street
Horizontal additions
Lowest floor + HVAC to base flood elevation
Shallow flood zones
3'6" above grade, or depth+2 ft
Certification required
FEMA elevation certificate, Form 81-31
Amended
Ord. No. 2025-36(6), Oct. 7, 2025

Summary

New buildings and substantial improvements in Jackson, whether inside or outside the mapped flood hazard area, must set the lowest floor at the elevation of the designated street's centerline unless topography makes that impossible, and any new horizontal addition must elevate its lowest floor and HVAC to the regulatory base flood elevation. The floodplain administrator verifies the finished elevation with a FEMA certificate.

(13)New construction and substantial improvement of any building (both in and outside the SFHA) shall have the lowest floor at the centerline of the existing right-of-way line as determined by the floodplain administrator. (14)All new horizontal additions must have the lowest floor and all HVAC elevated to the regulatory base flood elevation.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 55).

Full Breakdown

Sec. 62-41(13) sets a citywide elevation reference for the lowest floor of new construction and substantial improvements: the elevation of the centerline of the designated street, applying both inside and outside the special flood hazard area, unless the floodplain administrator determines the property's topography will not allow strict adherence. Sec. 62-41(14) adds that all new horizontal additions must have their lowest floor and all HVAC equipment elevated to the regulatory base flood elevation. The city verifies compliance through the permitting process in Sec. 62-32: before framing continues, the permit holder must submit a certification of the as-built lowest floor elevation, measured in relation to mean sea level (NAVD or NGVD), prepared by a Mississippi-registered land surveyor or professional engineer; upon completion, a FEMA elevation certificate depicting all finished construction elevations goes to the floodplain administrator, and any floodproofing measure requires a FEMA floodproofing certificate as well.

In shallow flooding zones designated on the FIRM, Sec. 62-44 sets an alternative numeric floor: the lowest floor must sit at or above the highest adjacent grade, at least as high as the FIRM's stated flood depth number plus two feet, or, if no depth number is given, at least three feet six inches above the highest adjacent grade. These standards were most recently amended by Ordinance No. 2025-36(6) on October 7, 2025.

Violations & Fines

Building below the required elevation, or failing to submit the as-built elevation certification before framing continues, is a Chapter 62 violation under Sec. 62-21: a misdemeanor carrying up to a $500.00 fine or 90 days in jail, or both, with each day of noncompliance a separate offense. Uncertified work also risks a stop-work order under Sec. 62-32(2).

Frequently Asked Questions

How high must a new home's lowest floor sit in a Jackson flood zone?
Under Sec. 62-41(13), the lowest floor of new construction or a substantial improvement is set at the elevation of the centerline of the designated street, whether the property is inside or outside the mapped special flood hazard area, unless the floodplain administrator finds the site's topography will not allow it.
What if the flood insurance rate map does not list a flood depth number?
Sec. 62-44 covers that case for shallow flooding zones: if no depth number is specified on the FIRM, the lowest floor, including any basement, must be elevated to no less than three feet six inches above the highest adjacent grade.
What proof does Jackson require that a building was actually built to the required elevation?
A FEMA elevation certificate depicting all finished construction elevations, prepared under Sec. 62-32(3), must go to the floodplain administrator once construction is complete; if the project used floodproofing instead of elevation, a FEMA floodproofing certificate is required as well.

Sources & Official References

Other rules in Jackson

All Jackson rules

Compare Jackson to another location·View the Mississippi hurricane preparedness overview

Get notified when Flood Elevation in Jackson, MS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.