Troup County, GA Landscaping Rules: Rainwater Harvesting (2026)
Key Facts
- No dedicated ordinance
- No standalone rainwater-harvesting rule in code
- Use table entry
- Grouped with wind turbines, Sec. 6.1
- Zoning status
- Permitted accessory use in nearly all districts
- Sustainability option
- One of several water-conservation options
- No specific standard
- No size or placement rule found
Summary
Troup County has no stand-alone rainwater-harvesting ordinance; the Unified Development Ordinance treats a rainwater collection system as an ordinary accessory use, permitted alongside wind turbines in nearly every zoning district under the Section 6.1 use table, and Section 5.4(4)(c) lists a rainwater or grey-water conservation system as one compliance option in the county's residential sustainability standards.
(4)In order to promote environmental sustainability for residential dwellings, such units shall utilize the following features to reduce energy and water consumption:a.Energy Star windowsb.Insulation: ... c.Low-flow bathroom and kitchen faucets or grey-water or rainwater conservation systems.
Full Breakdown
Rainwater harvesting doesn't get its own article in Troup County's code the way signs or manufactured housing do. The Section 6.1 Table of Permitted and Prohibited Uses lists "Wind Turbines, Rainwater Collection Systems" together as a single accessory use, marked permitted as an accessory use in the Agricultural, Agricultural-Residential, Suburban Residential, Lakeside Residential, Limited Commercial, Urban Village, Light Industrial, Heavy Industrial, and Manufactured Home Park districts, meaning a homeowner or business in nearly every district in the unincorporated county can install a rainwater collection system without a special use permit, so long as it stays accessory to the principal use on the lot.
The table flags the entry as one that carries "additional regulations in Article VII Supplemental," but Article VII's numbered subsection for wind turbines, Section 7.3(14), only sets a height and setback standard for the turbine itself, a 40-foot maximum height and a 40-foot setback from any property line, and does not add any separate size, placement, or plumbing standard specific to a rainwater collection system. Separately, Section 5.4(4), the county's building-architecture standard for residential dwellings outside the commercial and industrial corridor, requires new residential units to adopt sustainability features to cut energy and water use, and lists among the options in subsection (4)(c) low-flow bathroom and kitchen faucets or grey-water or rainwater conservation systems, alongside Energy Star windows and specific wall, foundation, and ceiling insulation R-values in subsection (4)(b).
That makes a rainwater system one of several ways a residential developer can satisfy the water-conservation piece of Section 5.4(4), rather than a mandate applied to every lot.
Violations & Fines
Because a rainwater collection system is an accessory use rather than a prohibited or heavily conditioned one, there's no dedicated penalty tied to installing one; a violation would only arise if the system exceeded the scope of an accessory use or a residential developer failed to meet the water-conservation requirement of Section 5.4(4) at all, which, like any other UDO violation, is enforced under Appendix A Section 2.1 and punishable under Troup County Code Section 1-19 by a fine of up to $1,000.00 per day.
Frequently Asked Questions
Do I need a permit to install a rain barrel or cistern in unincorporated Troup County?
Does the county require new homes to include rainwater harvesting?
Are there size or setback limits on a rainwater collection system?
Sources & Official References
Other rules in Troup County
Compare Troup County to another location·View the Georgia landscaping rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.