Skip to main content
CityRuleLookup

Snohomish County, WA Landscaping Rules: Rainwater Harvesting (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing sections
SCC 25.10.040; SCC 25.20.070(4)
Minimum storage
10% of mean annual roof runoff
Approval needed
Dept. of Planning & Development Services
Design standard
WSBCC Permissive Harvesting Guidelines
Eligible property
Commercial-use buildings only

Summary

Snohomish County doesn't require rainwater harvesting, but it pays commercial property owners for it: install a qualifying rooftop system under SCC 25.10.040 and the county's surface water management service charge drops under SCC 25.20.070(4), scaled to how much of your roof runoff the system actually captures.

City-specific rules exist: Lynnwood, and Marysville have their own rainwater harvesting rules that differ from Snohomish County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

25.10.040 Commercial rainwater harvesting system. A system for storing, collecting, and reusing rainwater from a rooftop, installed at a commercial-use building, that has been designed and constructed in accordance with the Washington State Building Code Council's Permissive Rainwater Harvesting System Guidelines for Non-residential Occupancies (2002 or as amended), has a storage volume of at least 10 percent of the mean annual runoff volume generated from the contributing roof area, and for which design and construction has been approved by the director of the department of planning and development services. ... (4) The rate charged for real property with a commercial rainwater harvesting system shall be reduced from the rate set out in this chapter by a fraction equal to the storage volume of the rainwater harvesting system divided by the mean annual runoff volume generated by the total impervious surface area of the property.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through legislation passed August 12, 2026).

Full Breakdown

040 as a system for storing, collecting, and reusing rainwater from a rooftop at a commercial-use building that has been designed and constructed in accordance with the Washington State Building Code Council's Permissive Rainwater Harvesting System Guidelines for Non-residential Occupancies, has a storage volume of at least 10 percent of the mean annual runoff volume generated from the contributing roof area, and has been approved by the director of the department of planning and development services. 070(4), part of the surface and storm water management utility's rate structure, provides that the rate charged for real property with a commercial rainwater harvesting system shall be reduced from the rate set out in this chapter by a fraction equal to the storage volume of the rainwater harvesting system divided by the mean annual runoff volume generated by the total impervious surface area of the property.

In practice, the bigger the system relative to the roof's total annual runoff, the bigger the proportional cut to the property's annual surface water management service charge. 080(2) for properties holding an active NPDES discharge permit. 132's commercial-development definition; there is no equivalent credit written into the code for a residential rain barrel or cistern.

Violations & Fines

There's no penalty for skipping rainwater harvesting: it's optional. But claiming the SCC 25.20.070(4) rate reduction for a system that doesn't meet the SCC 25.10.040 definition, meaning it lacks director approval, falls short of the 10 percent storage-to-runoff design standard, or isn't built to the state's Permissive Rainwater Harvesting Guidelines, means the county can deny the reduced rate and bill the standard surface water management charge.

Frequently Asked Questions

Does Snohomish County require rainwater harvesting?
No. The county has no mandate to install a rainwater harvesting system. Instead, SCC 25.20.070(4) offers commercial property owners a proportional reduction in their surface water management service charge if they voluntarily install a system meeting the SCC 25.10.040 definition.
How big does my rainwater harvesting system need to be for a fee break?
SCC 25.10.040 requires a storage volume of at least 10 percent of the mean annual runoff volume generated from the roof area the system serves, built to the Washington State Building Code Council's Permissive Rainwater Harvesting Guidelines for Non-residential Occupancies, and approved by the department of planning and development services director.
Can homeowners get this rate reduction for a residential rain barrel?
No. SCC 25.10.040 defines a qualifying system as one installed at a commercial-use building, and SCC 25.20.070(4) ties the rate reduction to that same commercial definition, so residential rain barrels or cisterns don't qualify for the surface water management fee credit.

Sources & Official References

Other rules in Snohomish County

All Snohomish County rules

Compare Snohomish County to another location·View the Washington landscaping rules overview

Get notified when Rainwater Harvesting in Snohomish County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Rainwater Harvesting in Cities Across Snohomish County