Newark, NJ Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
New buildings with 5+ dwelling units
Make-Ready minimum
15% of required parking
Phase-in
1/3 EVSE now, rest by year 6
Accessible EVSE
At least 5% of installed units
Small-lot exemption
25 or fewer spaces, single-family homes
Parking credit
EVSE space counts as 2 spaces

Summary

Newark's zoning code requires new multi-family buildings with five or more units, and new parking lots and garages, to install "Make-Ready" electric-vehicle charging infrastructure. Residential projects must prepare at least 15% of required parking as Make-Ready spaces, phasing in EVSE over six years. The rule is a permitted accessory use exempt from variance review under § 41:7-5-2.

As a condition of preliminary site plan approval, for each application involving a multiple dwelling with five or more units of dwelling space, which shall include a multiple dwelling that is held under a condominium or cooperative form of ownership, a mutual housing corporation, or a mixed-use development, the developer or owner, as applicable, shall: a. Prepare as Make-Ready parking spaces at least 15% of the required off-street parking spaces, and install EVSE in at least one-third of the 15% of Make-Ready parking spaces; b. Within three years following the date of the issuance of the certificate of occupancy, install EVSE in an additional one-third of the original 15% of Make-Ready parking spaces; and c. Within six years following the date of the issuance of the certificate of occupancy, install EVSE in the final one-third of the original 15% of Make-Ready parking spaces.

Source: NJ EV Charging Station Law - N.J.S.A. 40:55D-66.22View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 5019615; v61 updated 2026-06-17; through 06-17-2026).

Full Breakdown

Adopted November 1, 2023 by Ordinance No. 6PSF-E as City Code § 41:7-5, the chapter implements the state's Electric Vehicle Supply Equipment law. Any application involving a multiple dwelling of five or more units, including condominiums, cooperatives or mixed-use buildings, must prepare at least 15% of required off-street parking as Make-Ready spaces and install EVSE in one-third of that 15% before a certificate of occupancy issues, an additional one-third within three years, and the final one-third within six years; 5% of the installed EVSE must be accessible.

Parking lots and garages not covered by that rule scale by size: at least one Make-Ready space for 50 or fewer spaces, two for 51 to 75, three for 76 to 100, four (one accessible) for 101 to 150, and 4% (5% accessible) above 150 spaces. Retailers with 25 or fewer spaces and single-family homes are exempt. A. 40:55D-70, and adding EVSE to an existing gas station or retail building is approved administratively through a zoning permit rather than site plan review, so long as it does not violate bulk requirements.

A parking space equipped with EVSE or Make-Ready wiring counts as two spaces toward minimum parking requirements, capped at a 10% reduction in the total required.

Violations & Fines

Failure to meet the signage, installation or phase-in requirements of § 41:7-5 is enforced by the municipal engineer under the same penalty provisions as any other Newark zoning violation: a fine up to $1,000, up to 90 days of imprisonment or community service under § 41:18-3-1, with each day of noncompliance a separate offense. Parking a non-electric vehicle in a publicly accessible EVSE space, or an electric vehicle not connected to the charger, is separately enforced by the Newark Police Division as a parking violation subject to fine and/or towing.

Frequently Asked Questions

Does my new apartment building have to install EV chargers in Newark?
Yes, if it has five or more dwelling units. Section 41:7-5-3 requires at least 15% of the required off-street parking to be Make-Ready wiring, with EVSE actually installed in a third of that share at occupancy, another third within three years, and the last third within six years.
Do I need a variance to add a charging station to my property?
No. Section 41:7-5-2 makes an EVSE-only application a permitted accessory use in every zoning district, so it does not require a use variance under N.J.S.A. 40:55D-70, and adding chargers to an existing gas station or store is approved through a simple zoning permit.
Can I park a gas car in a Newark EV charging space?
No. Under § 41:7-5-5(3)(c), publicly accessible EVSE spaces are reserved for parking and charging electric vehicles that are actually plugged in; a non-electric vehicle parked there, or an EV left unplugged, is subject to fine and possible towing.

Sources & Official References

Other rules in Newark

All Newark rules

Compare Newark to another location·View the New Jersey parking rules overview

Get notified when EV Charging in Newark, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.