Palm Springs, CA Parking Rules: EV Charging (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing statute
Cal. Gov. Code § 65850.7
Adopted
Ordinance 2038, 2021
Electrical standard
Article 625, California Electrical Code
HOA approval
Cannot be required for permit issuance
Escalation path
Building Official finding to CUP to Planning Commission

Summary

Palm Springs runs electric vehicle charging stations through the same kind of expedited, nondiscretionary permit process it uses for rooftop solar, under Chapter 8.105 adopted to comply with Government Code Section 65850.7. The Building Official reviews applications against a published checklist and cannot condition approval on HOA sign-off.

The purpose of this chapter is to promote and encourage the use of electric vehicles by creating an expedited, streamlined permitting process for electric vehicle charging stations while promoting public health and safety in a manner consistent with California Government Code Section 65850.7. ... The electric vehicle charging station shall meet the applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories, and rules of the Public Utilities Commission and the local electric utility company regarding safety and reliability. ... If the Building Official makes a finding based on substantial evidence that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the City may require the applicant to apply for a conditional use permit pursuant to Chapter 94.02.00 of the Palm Springs Zoning Code.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4923139; v14 updated 2026-06-24).

Full Breakdown

7. Every charging station must meet Article 625 of the California Electrical Code along with safety and performance standards from the Society of Automotive Engineers, the National Electrical Manufacturers Association and accredited testing labs such as Underwriters Laboratories, and its installation must be incorporated into the building's electrical load calculations as a continuous load. Floor-mounted or wall-mounted units must be anchored per the California Building or Residential Code and the manufacturer's installation instructions, without adversely affecting building elements. The Building Official adopts a checklist drawn from the state's Plug-In Electric Vehicle Infrastructure Permitting Checklist and publishes it on the city website; applicants must first verify the installation will not create a specific, adverse impact on electrical capacity, wiring, building infrastructure or parking areas before submitting.

Electronic submittal and electronic signatures are accepted in place of wet signatures. A complete application is processed promptly, but a completed application alone does not authorize energizing the station until the city issues all necessary permits. 05. As with rooftop solar, the city cannot condition approval on sign-off from a homeowners' association under Civil Code Section 4080.

Violations & Fines

Chapter 8.105 sets no separate fine of its own; an unpermitted or energized-without-approval charging station is enforced through the citywide infraction and misdemeanor penalties in Sections 1.01.155 and 1.01.160, and the Building Official retains authority at all times to address higher-priority life-safety issues even during the expedited review track.

Frequently Asked Questions

Can I install a home EV charger without a discretionary permit in Palm Springs?
Yes, in the typical case. Chapter 8.105 processes charging stations through a nondiscretionary, expedited review limited to code compliance, and the city only requires a conditional use permit under Section 8.105.070(B) if the Building Official makes a written finding of a specific, adverse safety impact that cannot be mitigated.
Does my energized charger need a final inspection first?
Yes. Section 8.105.060(B) states that a complete application does not authorize energizing or using the charging station until the city has approved it and issued all necessary permits, so wiring cannot be turned on the moment paperwork is submitted.
Can my condo association require its own approval before I install a charger?
No. Section 8.105.070(D) prohibits the Building Official from conditioning a charging station permit on approval by an association as defined in California Civil Code Section 4080, mirroring the same protection the city extends to rooftop solar applicants under Chapter 8.100.

Sources & Official References

Other rules in Palm Springs

All Palm Springs rules

California rules heatmap·Compare Palm Springs to another location·View the California parking rules overview

Get notified when EV Charging in Palm Springs, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Riverside County handle ev charging.

Menifee, CA
Light Restrictions
Temecula, CA
Some Restrictions
Corona, CA
Some Restrictions
Moreno Valley, CA
Some Restrictions
Murrieta, CA
Some Restrictions
Riverside, CA
Few Restrictions