For new construction in unincorporated San Mateo County, the County's local amendments to the California Building and Energy Codes require EV charging infrastructure. Adopted February 25, 2020 and effective for permits, the rules require commercial buildings (excluding office) to install Level 2 EV charging at 6% of parking spaces and Level 1 circuits at 5%. Residents apply for EV charger permits through County Planning and Building.
Unincorporated San Mateo County requires electric-vehicle charging readiness in new buildings through local amendments to the California Building Standards Code (Title 24), which the County adopted on February 25, 2020 and which apply only to construction in the unincorporated County. The amendments require all-electric buildings, solar installation for multifamily and commercial buildings, and increased levels of EV charging infrastructure for all building types. For commercial buildings other than office uses, the local code requires installation of Level 2 EV charging stations at 6% of parking spaces and Level 1 circuits at an additional 5% of parking spaces, with credit available for installing DC fast chargers; these requirements apply to newly constructed, ground-up buildings and not to additions or remodels. Off-street, EV, ADA, and bicycle parking requirements for a given project vary by location and zoning under the Title 8 Development Code. For installing a home or business charger, unincorporated County residents and businesses apply for an electric-vehicle charging-station permit through the County Department of Planning and Building, and the County's Sustainability program provides additional guidance and incentives. Because these standards are tied to building permits and zoning, anyone planning a charger installation or a new development should confirm current requirements with Planning and Building before applying.
Failing to provide the required EV charging infrastructure in a covered new construction project, or installing a charging station without the required County permit, can hold up plan approval or inspection sign-off. The EV-readiness mandates apply to new ground-up buildings, not to remodels or additions.
Other ordinances people look up for this city. Green dot = verified primary-source excerpt.
Redwood City, CA
Redwood City prohibits construction noise in residential areas outside of 7 AM–8 PM weekdays. Construction on weekends and holidays is prohibited if it excee...
Redwood City, CA
Redwood City prohibits dogs from creating excessive noise that disturbs neighbors under Chapter 5 (Animals and Fowl) and the general noise ordinance. Animal ...
Redwood City, CA
Redwood City regulates noise under City Code Chapter 24. General quiet hours are 10 PM–7 AM Sunday through Thursday and 11 PM–7 AM Friday through Saturday. O...
Redwood City, CA
Max fence height in Redwood City: 3 ft (solid) or 5 ft (open-top) in the front-yard 15-ft setback, 7 ft on side and rear yards, and 5 ft+ for pool barriers. ...
Redwood City, CA
Fences in Redwood City that comply with height limits typically do not require a building permit. However, fences over 7 feet, retaining walls, or fences wit...
Redwood City, CA
Fence cost-sharing between neighbors in Redwood City is governed by California Civil Code §841 (Good Neighbor Fence Act). Disputes are civil matters; the cit...
Side-by-side rule comparisons with other cities in San Mateo County.
See how other cities in San Mateo County handle ev charging.
See how Redwood City's ev charging rules stack up against other locations.
Quick Compare
Help us keep this page accurate. If you notice an error or outdated information, let us know.