Ridgefield, CT Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
New commercial/multiunit bldg, 5+ spaces
Minimum EV-capable share
10% of spaces
Charging type
Level 2 and/or DC fast charging
Floor at 30+ spaces
Commission cannot go below 10%
Maximum extra required
Up to 20% of spaces
Adopted
A-23-1, effective 08/11/2023

Summary

Ridgefield requires new commercial buildings and multiunit residential buildings with five or more parking spaces to include EV charging capable of Level 2 or DC fast charging in at least 10% of those spaces, a floor the Commission can only raise, not waive, once a project creates 30 or more spaces.

For all new construction of a commercial building or multiunit residential building with 5 or more designated parking spaces for cars or light duty trucks, there must be included electric vehicle charging stations capable of supporting Level 2 and/or direct current fast charging in at least 10% of such parking spaces. The Commission may, at its discretion, and considering factors such as location, and proposed alterations, require less (as per PA 22-5, no less than 10% when 30 or more spaces are created) or no more than a 20% maximum of extra EV parking spaces capable of Level 2 and/or direct current fast charging.

View official code

Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.

Full Breakdown

4 of the Zoning Regulations, adopted by amendment A-23-1 effective August 11, 2023, applies to all new construction of a commercial building or a multiunit residential building that includes five or more designated parking spaces for cars or light-duty trucks. At least 10% of those spaces must be built with electric vehicle charging capability supporting Level 2 charging, DC fast charging, or both. The Commission has discretion to adjust that share based on factors like the site's location and any proposed alterations, but the Regulations tie that discretion to Public Act 22-5: the Commission cannot go below the 10% floor once a project creates 30 or more parking spaces, and it can require no more than a 20% maximum of additional EV-capable spaces beyond the base requirement.

B. A project that clears the five-space threshold has to show its EV-capable spaces on the site plan submitted for review, since the requirement attaches at new construction rather than as a retrofit obligation on existing lots.

Violations & Fines

A new qualifying building that omits the required share of EV-capable parking spaces is out of compliance with its site plan or special permit approval under Section 7.3.D.4; the Zoning Enforcement Officer can withhold a certificate of occupancy or issue a Section 9.4 violation notice, with continued noncompliance subject to the fines and per-day penalties of Connecticut General Statutes Chapter 124.

Frequently Asked Questions

Does Ridgefield require EV charging at new commercial buildings?
Yes. Section 7.3.D.4 of the Zoning Regulations requires any new commercial building or multiunit residential building with five or more parking spaces to include EV charging capable of Level 2 or DC fast charging in at least 10% of those spaces, adopted by amendment A-23-1 effective August 11, 2023.
Can Ridgefield's Planning and Zoning Commission reduce the EV parking requirement?
Only within limits. Section 7.3.D.4 lets the Commission adjust the share based on site factors, but it cannot go below the 10% floor once a project creates 30 or more parking spaces, tracking Public Act 22-5, and it can require no more than a 20% maximum of extra EV-capable spaces.
Does the EV charging rule apply to existing Ridgefield parking lots?
No. Section 7.3.D.4 attaches to new construction of a qualifying commercial or multiunit residential building with five or more spaces; it is not a retrofit requirement imposed on parking lots that already exist without new construction triggering site plan review.

Sources & Official References

Other rules in Ridgefield

All Ridgefield rules

Compare Ridgefield to another location·View the Connecticut parking rules overview

Get notified when EV Charging in Ridgefield, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.