Key Facts

Charging stalls count toward minimum parking
Yes, basic and rapid charging stations, VMC 20.945.070(H)(4)
Warehouse EV charging requirement
At least 20 percent of parking spaces on site
Warehouse size trigger
Larger than 250,000 square feet, ground floor
Loading dock wiring
Conduit to panels for future electric truck charging
Parking minimum for EV recharging station use
None in Table 20.945.070-2

Summary

Vancouver, Washington counts parking stalls used for EV basic and rapid charging stations toward the minimum required parking in a development (VMC 20.945.070(H)(4)). The only printed charging mandate is for warehouses larger than 250,000 square feet, which need EV charging stations at a minimum of 20 percent of parking spaces on site (VMC 20.895.120(D)(7)).

5. All loading docks shall be outfitted with electric wiring and conduit extending to electric panels to enable future installation of outlets for charging of electric-powered trucks. ... 7. Electric Vehicle Charging. EV charging stations shall be provided at a minimum of 20 percent of parking spaces on site. ... 4. Parking stalls used for electric vehicle basic charging stations and rapid charging stations shall be counted toward the minimum number of required parking stalls in a development.

Full Breakdown

Two Title 20 provisions govern EV charging and parking. VMC 20.945.070(H)(4), in the Minimum Off-Street Parking Requirements section, says parking stalls used for electric vehicle basic charging stations and rapid charging stations shall be counted toward the minimum number of required parking stalls in a development. A developer who installs chargers therefore does not have to add stalls on top of the required minimum. Table 20.945.070-2 also lists the Electric Vehicle Recharging Station use with a minimum parking requirement of None.

The mandate applies only to large warehouses. VMC 20.895.120 covers warehouse and freight movement buildings larger than 250,000 square feet of gross floor area on the ground floor, and its climate action measures include electric vehicle charging: EV charging stations shall be provided at a minimum of 20 percent of parking spaces on site (subsection D.7). The same subsection D.5 requires all loading docks to be outfitted with electric wiring and conduit extending to electric panels to enable future installation of outlets for charging of electric-powered trucks. Subsection D.1 adds structural and electrical readiness for rooftop solar panels.

The use classification in VMC 20.160.020 separates the equipment. An EV Basic Charging Station is a slow to medium level station typically accessory to another use, where Level 1 (120-volt AC) is slow charging and Level 2 (208- or 240-volt AC) is medium charging. An EV Rapid Charging Station is an industrial-grade outlet that meets standards under Chapter 19.28 RCW and rules adopted under RCW 19.27.540, also known as Level 3 (480-volt AC). An EV Battery Exchange Station lets a vehicle with a swappable battery swap a depleted battery for a charged one.

Use tables such as the one in VMC 20.630.070 for the City Center West Employment Overlay list EV Basic Charging Stations and EV Rapid Charging Stations, accessory and stand-alone, as P, meaning permitted.

Violations & Fines

The charging mandate sits in the Special Use Standards, so a warehouse over 250,000 square feet that omits the 20 percent EV charging provision fails a development standard applied through the land use review process. The provision prints no separate fine. Enforcement of Title 20 conditions runs through the City's planning and code enforcement officials, and no penalty amount is printed in the sections quoted here.

Frequently Asked Questions

Do EV charging stalls count toward required parking in Vancouver, WA?
Yes. VMC 20.945.070(H)(4) says parking stalls used for electric vehicle basic charging stations and rapid charging stations shall be counted toward the minimum number of required parking stalls in a development. Chargers do not require extra stalls beyond the minimum.
Must new developments in Vancouver install EV chargers?
The sections quoted here print a charging mandate for one category only: warehouses larger than 250,000 square feet of gross floor area on the ground floor, which must provide EV charging stations at a minimum of 20 percent of parking spaces on site under VMC 20.895.120(D)(7).
What do warehouses have to do for electric trucks?
VMC 20.895.120(D)(5) requires all loading docks to be outfitted with electric wiring and conduit extending to electric panels to enable future installation of outlets for charging of electric-powered trucks. This is conduit for future outlets, and the 20 percent figure applies to on-site parking spaces.
What is the difference between basic and rapid charging in the code?
VMC 20.160.020 defines an EV Basic Charging Station as slow to medium charging, with Level 1 at 120-volt AC and Level 2 at 208- or 240-volt AC. An EV Rapid Charging Station is a Level 3 facility at 480-volt AC, consistent with rules adopted under RCW 19.27.540.

Sources & Official References

Other rules in Vancouver

All Vancouver rules

Compare Vancouver to another location·View the Washington parking rules overview

Get notified when EV Charging in Vancouver, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.