Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Trigger
New construction or 50%+ floor-area expansion
Retail/office/industrial
1 space per 10,000-40,000 sq ft, then per 40,000
Hotels/hospitals
1 space at 30 units/beds, 2 over 60
CBD restriction
No parking/loading structure within 20 ft of frontage
Enforcement
Certificate of occupancy revocable, Sec. 98-2198
Penalty
Up to $500 per day, Sec. 98-6

Summary

Hialeah Code Sec. 98-2202 sets minimum off-street loading spaces whenever a building is newly constructed or an existing structure's floor area grows by 50 percent or more. Retail, office, restaurant, wholesale, warehouse, repair-service and industrial buildings need one loading space once floor area passes 10,000 square feet, plus another for every additional 40,000 square feet. Hotels, motels, hospitals and similar institutions trigger a space at 30 units or beds.

Sec. 98-2202. - Minimum off-street loading spaces required. When a building is constructed or when the floor area of an existing structure is enlarged by 50 percent or more, off-street loading spaces shall be provided as follows: (1)For retail, office, restaurant, wholesale, warehouse, repair service, industrial or similar uses:

Floor Area (square footage) / Loading Spaces Less than 10,000 / None 10,000 to 40,000 / 1 Each additional 40,000 or fraction thereof / 1

(2)For hotel, motel, hospital, adult congregate living facility, residential care and treatment facility and similar institutions or uses:

Units or Patient Beds / Loading Spaces Less than 30 / None 30 through 60 / 1 Over 60 / 2

Full Breakdown

Sec. 98-2202 applies "[w]hen a building is constructed or when the floor area of an existing structure is enlarged by 50 percent or more." For retail, office, restaurant, wholesale, warehouse, repair service, industrial or similar uses, the code sets a sliding scale: floor area under 10,000 square feet needs no dedicated loading space; 10,000 to 40,000 square feet requires one space; and each additional 40,000 square feet, or any fraction of it, adds one more space. Hotel, motel, hospital, adult congregate living facility, residential care and treatment facility and similar institutional uses are measured by units or patient beds instead of square footage: fewer than 30 units or beds needs no loading space, 30 through 60 requires one space, and anything over 60 requires two.

The neighboring section, Sec. 98-2203, layers on related requirements a project must also meet: guest parking equal to an extra one-quarter space per dwelling unit in residential developments without dedicated internal circulation rights-of-way, a ban on discontinuing or reducing required parking and loading facilities without city-approved substitutes, a rule that loading and circulation areas be used only for that purpose and kept clean and orderly, and, in the CBD central business district, a bar on locating parking lots and garages within 20 feet of the front property line or street side at ground level. Sec. 98-2198 backs this up by letting the building official revoke a certificate of occupancy if required parking or loading facilities are later found discontinued.

Violations & Fines

Sec. 98-6, chapter 98's general enforcement provision, governs: a fine of up to $500.00 per violation set by the court or administrative tribunal, with each day the loading requirement goes unmet counted as a separate offense. Sec. 98-2198 adds a direct consequence for loading and parking failures: the building official can revoke the certificate of occupancy once discontinued facilities are found on inspection.

Frequently Asked Questions

Does every commercial building in Hialeah need a loading dock?
Not unless it triggers the size thresholds in Sec. 98-2202. Retail, office and similar commercial buildings under 10,000 square feet need no dedicated loading space; one is required once floor area reaches 10,000 square feet, and another for every additional 40,000 square feet after that.
How are loading spaces calculated for a hotel or hospital?
By units or patient beds rather than square footage. Sec. 98-2202 requires no loading space under 30 units or beds, one space for 30 through 60, and two spaces once the count exceeds 60 units or beds.
Can a Hialeah business remove its required loading area later?
No. Sec. 98-2203(c) makes it unlawful to discontinue or reduce required parking and loading facilities without providing city-approved alternatives, and Sec. 98-2198 lets the building official revoke the certificate of occupancy if discontinued facilities are found on inspection.

Sources & Official References

Other rules in Hialeah

All Hialeah rules

Florida rules heatmap·Compare Hialeah to another location·View the Florida parking rules overview

Get notified when Loading Zones in Hialeah, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Loading Zones in Nearby Cities

How other cities in Miami-Dade County handle loading zones.

Miami, FL
Some Restrictions
Miami Beach, FL
Some Restrictions
Homestead, FL
Some Restrictions
Coral Gables, FL
Some Restrictions
Doral, FL
Some Restrictions