Key Facts
- Curbside loading zones
- Locations in Schedule X, designated by § 7-7
- Hours printed in § 7-7
- None; the schedule and posted signs control
- Minimum off-street loading
- One space per use, § 188-106(H)(1)
- Front yard loading areas
- Not allowed, § 188-106(I)(1)
- Large-tract reduction
- At least 25 acres, 200 feet from property lines
- Chapter 7 penalty
- Up to $50 or 15 days, or both
Summary
In Howell Township, § 7-7 designates the curbside loading zones by Schedule X of Chapter 7, and the section prints no hours of its own. Off-street, § 188-106 requires every use under site plan review to provide loading and maneuvering space, with at least one space per use, kept out of front yards and buffers.
The locations described in Schedule X attached to and made a part of this chapter are hereby designated as loading zones. ... H. Minimum loading requirements. Adequate off-street loading and maneuvering space shall be provided for every use based on the following schedule. Those uses not listed shall provide sufficient spaces as determined under site plan review. (1) There shall be a minimum of one space per use. ... I. Location of parking and loading areas. (1) No off-street loading and maneuvering area shall be located in any front yard nor require any part of a street. (2) Loading spaces shall abut the building being served, and be located to directly serve the building for which the space is being provided.
Full Breakdown
Curbside loading in Howell Township is set by a single sentence. Section 7-7 designates the locations described in Schedule X, attached to and made part of Chapter 7, as loading zones. The section prints no days, hours or time cap; those details sit with the schedule and the posted signs. Section 7-2 fixes any hours named in the chapter as Eastern Standard Time or Eastern Daylight Saving Time, whichever is in current use in the Township, and § 7-1 borrows its word meanings from Subtitle 1 of Title 39 of the Revised Statutes of New Jersey.
Two parking rules in the same chapter touch loading. In a residentially zoned area, § 7-3.7(a) lets a truck, tractor, trailer, bus, recreational vehicle or construction equipment stand on a street while actively used for delivery, pickup, loading and unloading of individuals and equipment, but a dumpster placed on a street has no exception. Under § 7-3.7(b), the rule does not apply to a truck or vehicle less than 25 feet in length.
Private commercial sites answer to Chapter 188, Land Use. Section 188-106 applies to uses requiring site plan approval. Subsection H requires adequate off-street loading and maneuvering space for every use, with a minimum of one space per use. For a shopping center or industrial complex, the count is based on the cumulative square feet in the building or complex and the spaces are dispersed through the site. Uses not listed get the spaces the Planning Board sets in site plan review. A tract of at least 25 acres can use fewer spaces if no part of a loading area is closer than 200 feet to a property line and the connecting driveway is at least 300 feet long. Subsection I keeps off-street loading and maneuvering areas out of any front yard, requires spaces to abut the building served, and bars loading spaces from any required buffer area. Subsection C requires concrete or Belgian block curbing around all loading areas, and subsection B buffers loading areas from adjoining streets and residential districts.
Violations & Fines
A conviction for violating a provision of Chapter 7 carries a penalty of not more than $50 or imprisonment for a term not exceeding 15 days, or both, under § 7-13, unless a New Jersey statute provides another penalty. The § 188-106 loading standards are conditions of site plan approval, and waivers of parking or loading requirements follow § 188-106(J), including a public hearing on the site plan with notice to owners within 200 feet.
Frequently Asked Questions
Where are the loading zones in Howell Township?
Can a delivery truck stop on a residential street in Howell Township?
How many loading spaces does a new business in Howell Township need?
Can a loading dock face the street in Howell Township?
Sources & Official References
Other rules in Howell
Compare Howell to another location·View the New Jersey parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Loading Zones in Nearby Cities
How other cities in this county handle loading zones.