Skip to main content
CityRuleLookup

Marietta, GA Parking Rules: Loading Zones (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum berth size
12 ft x 35 ft, 14 ft clearance
Retail ratio
1 berth per 20,000 sq ft gross floor area
Office/hotel ratio
1 berth per 75,000 sq ft
Industrial ratio
1 berth per 40,000 sq ft
Right-of-way loading
Barred except Central Business District zones
Governing section
Code of Ordinances § 716.10, Table K

Summary

Marietta requires certain commercial and industrial buildings to provide off-street loading berths at least 12 feet by 35 feet with 14 feet of overhead clearance. Table K sets the ratio by use, and Section 716.10 bans trucks from loading in the public right-of-way except in designated Central Business District loading zones.

Where required, off-street loading/unloading spaces shall be provided on the same or adjoining premises with the facility it serves, either inside or outside a building. A loading/unloading berth shall have a minimum dimension of 12 feet by 35 feet by 14 feet overhead clearance. Such facilities must be designed so that no truck/vehicle maneuvering occurs on the public right-of-way, nor in areas designated for the parking of vehicles, except in the Central Business District in which case designated loading/unloading zones may also be utilized. ... TABLE K. ... OFF-STREET LOADING REQUIREMENTS Use Required Loading Spaces Retail and vehicle sales operations, including accessory uses within hotels or office buildings One per 20,000 square feet of gross floor area (or fraction thereof)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 56).

Full Breakdown

10, Off-Street Loading Requirements, sits in the Planning and Development article's parking chapter and applies wherever a use is required to provide loading space under the schedule of district regulations. Every required loading or unloading berth must measure at least 12 feet by 35 feet, with 14 feet of overhead clearance, and must sit on the same or an adjoining premises as the facility it serves, inside or outside a building. Table K sets the ratio of required spaces to building size by use category: retail and vehicle sales operations, plus accessory uses within hotels or office buildings, need one berth per 20,000 square feet of gross floor area or fraction thereof; standalone office buildings and hotels need only one berth per 75,000 square feet; and industrial, manufacturing, warehouse and distribution uses need one berth per 40,000 square feet.

Loading areas must be adequately screened from residentially zoned property, subject to Development Services Director approval. Outside the Central Business District, no truck or vehicle may maneuver on the public right-of-way to reach a loading area, and no truck may use any part of the right-of-way to load or unload goods at all; only in the Central Business District can a business rely on a designated on-street loading/unloading zone instead of an off-street berth.

Violations & Fines

Failing to provide the required off-street loading berths, or loading trucks from the public right-of-way outside a designated Central Business District zone, is enforced as a zoning violation under Section 718.08: a fine up to $500 and/or up to six months in jail per offense, with continuing noncompliance treated as a new violation each day after 30 days from conviction.

Frequently Asked Questions

How big does a loading dock have to be in Marietta?
At least 12 feet by 35 feet with 14 feet of overhead clearance, per Section 716.10. It has to sit on the same or an adjoining lot as the business it serves, either inside or outside the building.
How many loading spaces does a Marietta retail store need?
One loading berth for every 20,000 square feet of gross floor area or fraction of it, under Table K of Section 716.10. Office buildings and hotels get a lighter ratio, one berth per 75,000 square feet, and industrial and warehouse uses need one per 40,000 square feet.
Can a delivery truck load from the street in Marietta?
Only in the Central Business District, where a designated on-street loading/unloading zone may substitute for an off-street berth. Everywhere else, Section 716.10 bars trucks from maneuvering or loading goods from any part of the public right-of-way.

Sources & Official References

Other rules in Marietta

All Marietta rules

Compare Marietta to another location·View the Georgia parking rules overview

Get notified when Loading Zones in Marietta, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Loading Zones in Nearby Cities

How other cities in Cobb County handle loading zones.

Acworth, GA
Some Restrictions