Fulton County, GA Parking Rules: Loading Zones (2026)
Key Facts
- Applies to
- Unincorporated Fulton County only
- Space size
- 12 ft x 35 ft min
- Vertical clearance
- 14 feet
- Residential buffer
- 50-ft landscaped strip
- Governing law
- Zoning Resolution §18.6.1, §18.6.3
Summary
Businesses in unincorporated Fulton County must build off-street loading spaces scaled to their gross floor area, each at least 12 by 35 feet with 14 feet of vertical clearance, and must screen loading areas behind a 50-foot landscaped strip wherever they sit next to a residential use.
18.6.1 Loading spaces required. Off-street loading spaces shall be provided as follows... 18.6.3 Off-street loading location limitations. Off-street loading spaces and maneuvering areas shall be located only in those portions of a lot where off-street parking areas are allowed with the following additional limitations... a 50-foot landscaped strip shall be established behind which the berths and maneuvering spaces may be located.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 57).
Full Breakdown
6 of the Fulton County Zoning Resolution applies only in unincorporated Fulton County; sites inside Atlanta, Sandy Springs and the county's other cities follow their own municipal codes instead. 1 requires that off-street loading spaces "shall be provided as follows," with the count scaled by two variables at once: the building's gross floor area and its use type. Retail stores, shopping centers, offices, hospitals, manufacturing plants and recycling centers each carry their own space requirements in the table, so two buildings of identical size can owe different numbers of loading berths.
As one example from the table, a shopping center of 20,000 to 49,999 square feet needs one loading space. 2 fixes the physical minimums: every required space must measure at least 12 feet by 35 feet and provide 14 feet of vertical clearance, so the berth itself, not the street, absorbs the truck. 3 then controls placement. Loading spaces and maneuvering areas may occupy only those portions of a lot where off-street parking areas are allowed, and where they adjoin a residential use, a 50-foot landscaped strip must be established, with the berths and maneuvering spaces located behind it. That strip is a hard separation between truck activity and neighboring homes, not an optional screening choice. The resolution sets no loading-dock operating hours.
Violations & Fines
A business built or expanded without the required loading spaces or the 50-foot landscaped buffer can be cited by Code Enforcement and denied a certificate of occupancy until the site plan conforms to §18.6.
Frequently Asked Questions
How many loading spaces does a Fulton County business need?
How big does each loading space have to be?
Can loading docks sit next to a house?
Does this rule apply inside Atlanta?
Sources & Official References
Other rules in Fulton County
Compare Fulton County to another location·View the Georgia parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.