Florissant, MO Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required for
Any excavation in street, sidewalk, alley, ROW or easement
Standard fee
$50 per excavation
Multi-dig job fee
$100 flat fee
Insurance required
$1 million liability or $100,000 bond
Compliance deposit
$2,000 cash or bond
Exempt
City work and true emergencies

Summary

Nobody may dig in a Florissant street, sidewalk, alley, right-of-way or easement without a City excavation permit, which costs $50 per dig ($100 if several digs complete one job) and requires $1 million in liability insurance or a $100,000 bond, plus a separate $2,000 cash deposit or bond with the Director of Finance.

No person shall make or cause to be made any excavation in any public place, street, highway, walkway, alley, right-of-way or easement without first obtaining a permit from the City as provided by this Article, except public work done under the authority of the Council by the employees of the City or by any contractor under contract with the City and except as otherwise provided in Section 530.090. ... Application for an excavation permit as required by Section 530.120 shall be made in writing to the Director of Public Works, which application shall contain information regarding the purpose, location and size of the proposed excavation and the approximate time when work on same will be commenced. Except as otherwise provided by Section 530.150, each excavation shall require a separate permit for which a fee of fifty dollars ($50.00) shall be paid. ... Prior to the issuance of any excavation permit, there shall be deposited and maintained with the Director of Finance a cash deposit or a bond in the amount of two thousand dollars ($2,000.00) to secure compliance with the provisions of this Article.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4989395; v43 updated 2026-05-26; through 05-26-2026).

Full Breakdown

120 sets the baseline rule: no person may make or cause to be made any excavation in a public place, street, highway, walkway, alley, right-of-way or easement without first obtaining a permit under Chapter 530, Article II. 090, where the applicant instead notifies the Police Department and applies for the permit the next business day the Public Works office is open. 150 applies, which sets a flat $100 fee covering multiple excavations needed to complete a single job. 030 of $1 million in liability insurance per person, per occurrence and for property damage, or post a $100,000 surety bond instead; individual property owners doing their own work without an outside contractor are exempt from that insurance requirement.

130 requires a $2,000 cash deposit or bond with the Director of Finance to secure compliance with the whole excavation article. Permit holders must also state how long the work will take and restore the surface to its original condition once finished.

Violations & Fines

Excavating in a Florissant public street, sidewalk, alley or easement without the Section 530.120 permit, or failing to meet the estimated completion time stated on the permit without an extension from the Director of Public Works, violates Chapter 530, Article II; the City can also require unsupervised backfill to be dug up and replaced under a street inspector's supervision at the violator's expense.

Frequently Asked Questions

Do I need a permit to dig up a Florissant street or sidewalk right-of-way?
Yes. Section 530.120 requires anyone excavating in a public place, street, highway, walkway, alley, right-of-way or easement to first get an excavation permit from the City, unless the work is done by the City itself, a City contractor, or falls under the Section 530.090 emergency exception.
How much does a Florissant right-of-way excavation permit cost?
The standard fee is $50 for each separate excavation. If a single job requires several excavations, Section 530.150 lets the applicant pay one flat $100 fee instead of $50 per hole, provided all the excavations are for the same project.
What insurance do I need before Florissant issues an excavation permit?
Applicants must show $1 million in liability insurance for bodily injury per person, per occurrence, and for property damage, or post a $100,000 surety bond instead. A separate $2,000 cash deposit or bond must also be on file with the Director of Finance to secure compliance with the excavation article.

Sources & Official References

Other rules in Florissant

All Florissant rules

Compare Florissant to another location·View the Missouri sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Florissant, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.