Kill Devil Hills, NC Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Approving department
- Public Services Department
- Minimum driveway width
- 10 feet
- Approved materials
- concrete or asphalt only
- Permanent structures in ROW
- prohibited
- Developer bond hold
- up to 120 days
Summary
Kill Devil Hills requires Public Services Department approval before any driveway, walkway or drainage improvement is built in a town right-of-way, with set width, material and culvert standards. Hard or permanent structures within the right-of-way are outright barred.
Property owners proposing to install driveways, walkways, culvert pipes, ditches or swales, or similar access improvements within town-owned rights-of-way, shall be responsible for construction and maintenance of such improvements within the right-of-way. Construction plans shall be submitted showing width, length, elevations and type of materials to be used for such access improvements. Upon approval by the Public Services Department, the property owner or contractor shall schedule an on-site, pre-construction meeting with a representative of the Public Services Department. ... Hard or permanent structures are prohibited within the right-of-way.
Full Breakdown
16(A) makes property owners who install driveways, walkways, culvert pipes, ditches or swales in town-owned rights-of-way responsible for construction and maintenance, and requires them to submit construction plans showing width, length, elevations and materials for Public Services Department approval, schedule an on-site pre-construction meeting, and secure final approval before a certificate of occupancy issues on new construction. Only concrete or asphalt may be used absent a site-specific Public Services exception, and single- and two-family driveways need at least one paved section a minimum of 10 feet wide with up to a 15-foot radius and 10-foot length from the existing pavement edge, built of 4-inch 3,000 psi concrete (6 inches within 3 feet of the pavement edge) or an ABC stone base topped with asphalt.
Culverts crossing town ditches must be installed before the driveway is built, using aluminum or double-walled HDPE pipe per NCDOT specifications, sized as the Public Services Department directs (with a specific size table for the east side of Memorial Boulevard), and inspected by the department before backfilling. 16(B) allows adjacent owners to seed or landscape the right-of-way strip between the pavement and their property line but flatly bans hard or permanent structures there and bars anything that would obstruct the street or drainage. 16(C) requires private developers building a new street in a town right-of-way to post a seeding-and-stabilization bond, calculated from a certified cost estimate plus 15% contingency, held for up to 120 days after the Board of Commissioners accepts the completed work.
Violations & Fines
Improvements built in the right-of-way without the required plans or Public Services Department approval are not authorized under § 91.16, and final approval must be secured before an occupancy permit issues on new construction. Hard or permanent structures placed in the right-of-way are prohibited outright under § 91.16(B)(2), and access across a drainage ditch or swale without prior approval is likewise barred under § 91.16(A)(2).
Frequently Asked Questions
Do I need town approval to build a driveway in the right-of-way in Kill Devil Hills?
Can I build a fence or wall in the right-of-way strip near the street?
What materials are allowed for a driveway crossing a town right-of-way?
Sources & Official References
Other rules in Kill Devil Hills
Compare Kill Devil Hills to another location·View the North Carolina sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.