Loveland, CO Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit trigger
Permit required for construction, excavation or work in ROW
Security
Letter of credit: construction cost or $5,000, minimum
Insurance
Liability insurance: $1M bodily injury, $500K property
Unpermitted work
Working without a permit draws a civil penalty
Appeal
Permit revocation appealable to city manager in 15 days
Snow permits
Emergency snow-removal permits renew annually April 1-June 30

Summary

Anyone doing construction, excavation or other work in a Loveland public right-of-way needs a permit under Municipal Code § 12.16.040. The permit fee is set by council resolution and tied to the actual cost of managing the right-of-way, and applicants must typically post a letter of credit equal to their construction cost or $5,000, whichever is greater.

No person shall undertake or permit to be undertaken any construction, excavation, or work in the rights-of-way without first obtaining a permit from the city as set forth in this chapter, except as provided in Section 12.16.210. ... Before a permit is issued pursuant to this chapter, the applicant shall pay to the city a permit fee, which shall be determined in accordance with a fee schedule adopted by the city council by resolution. Fees will be reasonably related to the costs inherent in managing the rights-of-way.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 13).

Full Breakdown

A requires a city permit before any person undertakes construction, excavation or other work in a Loveland right-of-way, with narrow exceptions for initial development under city development standards, city-approved capital projects, and routine maintenance that does not require lane closures or traffic control. S. Means standards, proof the applicant isn't delinquent on prior city work, and copies of any state or federal permits or licenses needed. 060 sets the permit fee by council resolution, calibrated to the city's actual costs of permitting, mapping, inspecting and administering right-of-way work, with reduced degradation fees when multiple unrelated entities share one excavation or when the work happens within 24 months of a scheduled repaving.

070 requires the permittee to carry commercial general liability insurance of at least $1,000,000 per occurrence for bodily injury and $500,000 per occurrence for property damage, plus workers' compensation coverage. 080 requires a letter of credit equal to the full construction cost or $5,000, whichever is greater, before the permit issues, though the city may waive it if the applicant shows financial stability and in-state assets. 230.

Violations & Fines

Working in a Loveland right-of-way without a permit requires the person to immediately cease all activity except emergency stabilization, obtain the permit before restarting, and pay a civil penalty set by council resolution on top of the normal permit fees (§ 12.16.040.E). Any violation of Chapter 12.16 is also punished under § 12.16.250 as provided in § 1.12.010, with each day of a continuing violation charged as a separate offense.

Frequently Asked Questions

Do I need a permit to dig in a Loveland street or sidewalk right-of-way?
Yes. Municipal Code § 12.16.040 requires a city permit before any construction, excavation or work in a Loveland right-of-way, with narrow exceptions for initial property development, city-approved projects, and routine maintenance that doesn't need lane closures. Working without a permit means immediately stopping work and paying a civil penalty on top of the normal fees.
How much does a Loveland right-of-way encroachment permit cost?
The fee is set by city council resolution under § 12.16.060 and is tied to the city's actual costs of permitting, mapping and inspecting the work, including any pavement degradation caused by the excavation. The degradation portion is reduced if multiple unrelated entities share the same excavation or the work happens shortly before scheduled repaving.
What security does Loveland require before issuing an encroachment permit?
Section 12.16.080 requires a letter of credit equal to the full cost of construction or $5,000, whichever is greater, plus proof of commercial general liability insurance of at least $1,000,000 per occurrence for bodily injury and $500,000 for property damage under § 12.16.070. The city may waive the letter of credit if the applicant proves financial stability with in-state assets.

Sources & Official References

Other rules in Loveland

All Loveland rules

Compare Loveland to another location·View the Colorado sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Loveland, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.