Placentia, CA Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit issuer
Engineering division, Public Works Department
Permit required for
Construction or excavation in public right-of-way or city easement
Permit and inspection fees
Set by city council resolution
Unpermitted work penalty
Equal to the permit fee, minimum $25
Excavation deposit
$400 plus $2.50 per square foot excavated
Deposit refund
On written request six months after completion

Summary

In the City of Placentia, California, an encroachment permit from the engineering division of the public works department is required for any construction or excavation in a public right-of-way or city easement. Fees are set by city council resolution, and starting work without the permit doubles the permit fee, with a $25 minimum penalty.

Encroachment permit (public right-of-way) fees shall be as follows: (1) An encroachment permit issued by the engineering division of the public works department is required for any construction or excavation to be performed within a public right-of-way or easement dedicated to the city. (2) Encroachment permit issuance fee shall be established by city council resolution. (3) Inspection fees shall be established by city council resolution. EXCEPTIONS: (1) Work performed by contract with the city. (2) Work within boundaries of new development under construction as previously approved by the city. ... Any person who commences any work for which a permit is required without first having obtained a permit therefor shall, if subsequently allowed to obtain a permit, pay the required permit fee established by city council resolution for such work and an additional penalty fee in an amount equal to the required permit fee; provided, that no penalty fee shall be less than $25 ... No person shall dig, cut into or make any excavation or opening in any public street, avenue, alley or other public place in the city, without first obtaining from the public works director a permit to do so and making the deposits with the city as provided in this article.

Full Breakdown

Section 5.24.010 of the Placentia Municipal Code requires an encroachment permit issued by the engineering division of the public works department for any construction or excavation performed within a public right-of-way or an easement dedicated to the city. The permit issuance fee and the inspection fees are both established by city council resolution, so the dollar amounts live in the current fee schedule rather than in the code. Two exceptions apply: work performed by contract with the city, and work inside the boundaries of a new development under construction as previously approved by the city.

Excavation has its own rules in Title 14. Section 14.04.100 bars anyone from digging, cutting into or making any excavation or opening in a public street, avenue, alley or other public place without first obtaining a permit from the public works director and making the deposits the article requires. The application under § 14.04.120 must include a map or drawing showing the exact location of the excavation relative to street lines and property corners, plus its depth, length and width, the use proposed for that portion of the street, and the depth of any pipelines or conduits.

Deposits protect the street. Under § 5.24.023, excavation within improved areas requires a cash deposit posted at permit issuance, set at $400 plus $2.50 per square foot of excavated area, refundable on written request six months after the work is complete, and waived for city-franchised utilities. Under § 14.04.150 the public works director inspects the work and requires the street to be restored to as good a condition as before the excavation, with repair costs deducted from the deposit if the permittee does not do the repair. Pipe and conduit must be laid not less than three feet from the established grade, with a 15-inch minimum cover on residential streets of 44 feet curb to curb width or less (§ 14.04.170).

Sidewalk, curb, gutter and driveway work needs a separate written application to the public works director (§ 14.04.040), and the person must give not less than forty-eight hours notice for inspection (§ 14.04.060). New or rebuilt sidewalks must be not less than five feet wide (§ 14.04.070). Under § 14.04.010, an excavation or obstruction in a street or alley between sundown and sunup must be guarded with suitable warning lights.

Violations & Fines

Anyone who starts permit-required work without first obtaining the permit, and is later allowed to obtain one, pays the permit fee set by council resolution plus an additional penalty fee equal to that permit fee, with a floor of $25. Emergency work is excused only when the engineering division inspector or other authorized city official is satisfied it was urgently necessary and a permit could not practically be obtained first, and the permit must still be obtained as soon as practical. Unreasonable delay brings the penalty back. Placing an obstruction in a street, sidewalk or parkway without authorization is barred by § 14.04.010.

Frequently Asked Questions

Who issues an encroachment permit in Placentia?
In the City of Placentia the engineering division of the public works department issues the encroachment permit required by Municipal Code § 5.24.010. Excavation permits under Chapter 14.04 are issued by the public works director, and the application needs a map showing the exact excavation location, depth, length and width.
What does an encroachment permit cost in Placentia?
The code does not print the dollar amounts. Section 5.24.010 says the permit issuance fee and the inspection fees are established by city council resolution, so the current figures are in the council's fee schedule. For excavation in improved areas the code does print a deposit of $400 plus $2.50 per square foot.
What is the penalty for starting work without a permit?
Under § 5.24.011 a person who starts permit-required work without a permit and is later allowed to obtain one pays the required fee plus an additional penalty fee equal to that fee. No penalty fee is less than $25. Proven urgent emergency work is excused from the penalty, but the permit must follow as soon as practical.
Is any work exempt from the encroachment permit?
Yes, two categories are listed in § 5.24.010: work performed by contract with the city, and work within the boundaries of a new development under construction as previously approved by the city. Everything else in a public right-of-way or city easement needs the engineering division's permit.
When do I get my excavation deposit back?
Under § 5.24.023 the cash deposit for excavation within improved areas is refundable upon written request six months after completion of the work. Section 14.04.160 allows the city to deduct the cost of any repairs it has to make. City-franchised utilities are waived from the deposit.

Sources & Official References

Other rules in Placentia

All Placentia rules

California rules heatmap·Compare Placentia to another location·View the California sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Placentia, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Encroachment Permits in Nearby Cities

How other cities in Orange County handle encroachment permits.

Anaheim, CA
Some Restrictions
Costa Mesa, CA
Significant Restrictions
Fullerton, CA
Some Restrictions
Garden Grove, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Irvine, CA
Some Restrictions
Mission Viejo, CA
Some Restrictions
Orange, CA
Significant Restrictions