Joliet, IL Sidewalk & Pedestrian Rules: Sidewalk Repair (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Code of Ordinances Sec. 26-38
Repair window
15 days after written notice
Who pays
Abutting owner via special assessment
New sidewalk deadline
90 days after curb/gutter install
Permit required
Sec. 26-33, fee per lineal foot
General penalty
$150-$750 per offense (Sec. 1-8)

Summary

Under City Code Sec. 26-38, the city engineer flags unsafe sidewalks and the city council can pass an assessment ordinance charging repair costs to the abutting property owner. Owners then get fifteen days to fix the sidewalk themselves before the city steps in and bills them through a special assessment.

(a)Whenever any sidewalk shall, from breakage, natural wear or age, become unsafe for ordinary travel thereon, it shall be the duty of the city engineer to notify the corporation counsel of this fact. The corporation counsel shall prepare an ordinance for the consideration of the city council, providing for the repair of the defective sidewalk and providing for a special assessment against the abutting property owner for the cost of repairs and replacement.(b)If the city council should pass the ordinance referred to in subsection (a), the city engineer shall give written notice of this fact to the abutting property owners affected by the ordinance. The property owners shall have the option of repairing the sidewalk within fifteen (15) days from the date of the notice or allowing the city, under the authority of the ordinance, to repair the sidewalk.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 200).

Full Breakdown

Joliet's Code of Ordinances places the cost of fixing broken public sidewalks on the property owner next to them, not on the city budget. Sec. ' The corporation counsel then drafts an assessment ordinance for the city council, which authorizes both the repair work and a special assessment against the abutting owner for the full cost of repair and replacement. Once the council passes that ordinance, Sec. 26-38(b) gives the engineer's office the job of sending written notice to every affected owner. From the date of that notice, the owner has fifteen days to repair the sidewalk on their own; if they don't, the city repairs it under the ordinance's authority and recovers the cost through the assessment.

This repair duty sits alongside a separate installation duty: Sec. 26-40 requires owners to install a sidewalk within ninety days after the city builds curbs and gutters along their frontage, again enforced through a special assessment district if the owner misses the deadline. New construction and replacement work both require a permit from the city engineer under Sec. 90 per 50 feet for replacement). Anyone who builds or repairs a sidewalk without that permit, or off the established grade, can be stopped mid-job under Sec. 26-39 and is subject to the general penalty in Sec. 1-8.

Violations & Fines

Working on a sidewalk without the Sec. 26-33 permit, or off the engineer's grade, triggers a stop-work order under Sec. 26-39 and the general Code penalty in Sec. 1-8: a fine of $150.00 to $750.00 per offense, with each day of an ongoing violation counted separately. Ignoring a Sec. 26-38 repair notice doesn't draw a direct fine, it converts into a special assessment lien the city collects through the ordinance the council passed for that block.

Frequently Asked Questions

Who is responsible for fixing a broken sidewalk in Joliet?
The abutting property owner is. Once the city engineer flags a sidewalk as unsafe under Sec. 26-38 and the city council passes an assessment ordinance, the owner has fifteen days from written notice to make the repair. If they don't, the city repairs it and bills the owner through a special assessment against the property.
Do I need a permit to repair my own sidewalk?
Yes. Sec. 26-33 requires a written application to the city engineer at least ten days before starting work, along with a fee based on length, before you pour new sidewalk or replace an existing panel. Skipping the permit can trigger a stop-work order under Sec. 26-39.
What happens if I ignore the sidewalk repair notice?
The city engineer's office arranges the repair itself under the authority of the assessment ordinance the council passed, then recovers the full cost from you as a special assessment against the property, separate from any fine for working without a permit.
Does Joliet make owners install sidewalks where none exist?
Yes, under a related rule, Sec. 26-40. Once the city finishes curbs and gutters on a street, abutting owners have ninety days from written notice to install sidewalks, or the city creates a special assessment district to build them and bills the owners.

Sources & Official References

Other rules in Joliet

All Joliet rules

Compare Joliet to another location·View the Illinois sidewalk & pedestrian rules overview

Get notified when Sidewalk Repair in Joliet, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.