Orlando, FL Sidewalk & Pedestrian Rules: Sidewalk Repair (2026)
Key Facts
- Governing section
- City Code § 54.41
- Repair deadline after notice
- 45 days
- Notice methods
- Personal delivery, mail, publication, or posting (§54.43)
- City-tree root damage
- City repairs at no owner cost (§54.42)
- Non-payment remedy
- City repairs and files a lien (§54.44)
- Lien priority
- Superior to all liens except taxes
Summary
Orlando puts the duty to build or repair a sidewalk or parkway on the owner of the abutting property under City Code § 54.41, giving the owner 45 days after written notice to fix damage caused by the owner or their agents: except that City-owned parkway trees are the City's repair responsibility, not the owner's.
The owner of any real estate in the City which adjoins rights-of-way on which any sidewalk or parkway shall have been ordered laid, or on which an existing sidewalk or parkway shall be in disrepair, due to action attributable to the adjoining property owner or his employees or agents, shall upon proper notice as provided in Section 54.43 be required to construct or repair said sidewalk and parkway within a period of forty-five (45) days.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 92).
Full Breakdown
Section 54.41 requires the owner of real estate adjoining a right-of-way to construct or repair a sidewalk or parkway within 45 days once the City gives proper notice under Section 54.43, but only where the disrepair is due to action attributable to the adjoining property owner or his employees or agents. Section 54.43 lets the City Engineer or another designated officer serve that notice by personal delivery or registered mail; if there's no known address, notice runs instead as a published legal ad once a week for two consecutive weeks, or as a posting on the lot itself for two weeks, using the name on the last confirmed county tax roll as the presumed owner.
Section 54.42 carves out the key exception: sidewalk damage caused by roots, falling limbs, or removal of a tree standing in the City parkway is repaired by the City at no cost to the abutting owner, but damage from a tree on the owner's own private property is treated as attributable to the owner and falls back under Section 54.41's 45-day duty. If an owner who received proper notice fails or refuses to repair within the 45 days, Section 54.44 lets the City construct or repair the sidewalk or parkway itself and place a lien on the property for the reasonable cost of the work, a lien that is superior to all other liens except for taxes.
Before any of this, Section 54.40 lets the City Engineer inspect and condemn newly built sidewalks or driveways that don't meet standard specifications, including coring concrete to check compliance, and order the adjoining owner to rebuild within a specified time.
Violations & Fines
An owner who ignores a proper Section 54.43 repair notice and fails to fix a sidewalk or parkway within 45 days doesn't face a criminal fine directly: instead, Section 54.44 lets the City perform the repair and record a lien against the property for the full cost, a lien that outranks every other lien except unpaid property taxes.
Frequently Asked Questions
Who has to fix a broken sidewalk in front of my Orlando house?
What if a City-owned street tree's roots cracked my sidewalk?
What happens if I don't repair my sidewalk after getting a notice?
How will the City notify me that my sidewalk needs repair?
Sources & Official References
Other rules in Orlando
Florida rules heatmap·Compare Orlando to another location·View the Florida sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.