Lynchburg, VA Sign Regulations: Digital Billboards (2026)
Key Facts
- By-right districts
- I-2 and I-3 industrial districts
- Conversion allowance
- Existing B-5 billboards may convert
- Message change rate
- No faster than once every 6 seconds
- Brightness cap
- 0.3 footcandle over ambient at 250 ft
- Max sign area
- 675 square feet
- Max height
- 40 feet
- Permit
- Building Permit required, Sec. 35.2-64.16(m)
Summary
Lynchburg allows commercial electronic billboards by right in its I-2 and I-3 industrial districts, and lets an existing B-5 billboard convert to digital, under Sec. 35.2-64.16(j); converted and new digital billboards must then meet the message-timing, brightness, and dimming standards in Sec. 35.2-64.16(k).
(j)Commercial electronic variable message signs or digital billboards are legal and conforming and permitted in I-2, Light Industrial Districts and I-3, Heavy Industrial Districts by right. Existing billboards in B-5, General Business Districts may be converted to a digital billboard by right and upon such conversion shall be legal and conforming.(k)Digital billboards shall conform to the following additional standards:1.Digital billboards shall not change the displayed message more frequently than once every six seconds.2.Display brightness shall not exceed three-tenths foot-candles over ambient light levels. Foot-candle readings shall be measured using an appropriate meter at a distance of 250 feet perpendicular to the face of the digital billboard.3.Digital billboards shall have automatic dimming capabilities.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 10).
Full Breakdown
Lynchburg's billboard ordinance treats digital displays as a subcategory of the same Sec. 16 that governs all off-premises advertising structures. Paragraph (j) makes commercial electronic variable message signs and digital billboards legal, conforming, by-right uses in the I-2 Light Industrial and I-3 Heavy Industrial districts, and separately allows any billboard already standing in a B-5 General Business district to be converted to digital and remain legal and conforming once converted. Any digital billboard, whether newly built in an industrial district or converted from an existing B-5 structure, must then satisfy the three additional standards in paragraph (k): the displayed message cannot change more than once every six seconds, display brightness cannot exceed three-tenths of a foot-candle over ambient light levels as measured 250 feet perpendicular to the sign face, and the sign must carry automatic dimming capability to hold that brightness ceiling as ambient light changes.
Digital billboards remain subject to every other requirement in Sec. 16 that applies to conventional billboards: the 675-square-foot maximum advertising surface, the 40-foot height ceiling measured from the base or the roadway grade, the prohibition on flashing or movement-simulating displays under paragraph (h), the ban on new construction within 1,320 feet of the John Lynch Memorial Bridge and the Carter Glass Bridge, and the requirement in paragraph (m) that no billboard be erected, rebuilt, altered, or relocated without a Building Permit. A billboard erected before the ordinance's June 2018 amendment that does not meet these standards is treated as a legal nonconforming structure rather than an immediate violation.
Violations & Fines
Erecting or converting a digital billboard without the required Building Permit under Sec. 35.2-64.16(m), or operating one that changes message faster than every six seconds or exceeds the three-tenths foot-candle brightness ceiling in Sec. 35.2-64.16(k), is enforced as a zoning violation under Sec. 35.2-102. A property owner who does not correct the violation after notice faces a misdemeanor fine of up to $1,000 under Sec. 35.2-102.2, with each 30-day period of continued noncompliance charged as a separate offense.
Frequently Asked Questions
Where can a new digital billboard be built in Lynchburg?
How fast can a Lynchburg digital billboard change its message?
Does a digital billboard still have to meet the regular size and height rules?
What permit does converting a billboard to digital require?
Sources & Official References
Other rules in Lynchburg
Compare Lynchburg to another location·View the Virginia sign regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.