Clovis, CA Solar Energy: Expedited Solar Permitting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing chapter
Clovis Municipal Code Chapter 8.14
System size cap
10 kW AC / 30 kW thermal
Over-the-counter turnaround
Next business day
Electronic application turnaround
3 business days
Appeal body
City of Clovis Appeals Board

Summary

Clovis Municipal Code Chapter 8.14 gives small residential rooftop solar systems a next-day-to-3-day, nondiscretionary permit review instead of standard discretionary review. The Building Department must issue the permit the next business day for a complete over-the-counter application, or within three business days for a complete electronic submission, using a standard plan and checklist drawn from the state's Solar Permitting Guidebook.

(d) The City of Clovis's Building Department shall adopt a standard plan and checklist of all requirements with which small residential rooftop solar energy systems shall comply to be eligible for expedited review. (e) The small residential rooftop solar system permit process, standard plan(s), and checklist(s) shall substantially conform to recommendations for expedited permitting, including the checklist and standard plans contained in the most current version of the California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research... (a) The City of Clovis Building Department shall adopt an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems within thirty (30) days of the adoption of this chapter. The Building Department shall issue a permit or other nondiscretionary permit the following business day for over-the-counter applications which are deemed complete or within three (3) business days for electronic applications of receipt of a complete application and meets the requirements of the approved checklist and standard plan.

Full Breakdown

02(f) as no larger than 10 kW AC (or 30 kW thermal), code-compliant, mounted on a single or duplex dwelling, and no taller than the City's maximum legal building height. 05 requires the Building Department to post all required application documents on the City's website, accept electronic submittal by email, internet, or fax, accept electronic signatures in place of a wet signature, and adopt a standard plan and checklist that a system must meet to qualify for expedited review; that checklist and standard plan must substantially conform to the recommendations in the current California Solar Permitting Guidebook published by the Governor's Office of Planning and Research.

06(a) then requires the Building Department to run an administrative, nondiscretionary review: a complete over-the-counter application gets a permit issued the next business day, and a complete electronic application gets one within three business days. A Building Official may instead require a discretionary use permit only if the Official finds, on substantial evidence, that the system could have a specific, adverse impact on public health and safety, and that decision, along with any use-permit denial, is appealable to the City of Clovis Appeals Board. 55, 66015, and 66016, and Health and Safety Code Section 17951.

Violations & Fines

The City may not condition approval on approval from a homeowners' association (Section 8.14.06(f)), and any health-or-safety condition it imposes must mitigate the specific adverse impact at the lowest possible cost (Section 8.14.06(d)). If an application is deemed incomplete, Section 8.14.06(g) requires a written correction notice detailing every deficiency, rather than an outright denial, before expedited review can proceed.

Frequently Asked Questions

How fast can I get a solar panel permit approved in Clovis?
Under Section 8.14.06(a), a complete over-the-counter application for a small residential rooftop solar system gets a permit the next business day, and a complete electronic application gets one within three business days, through the City's nondiscretionary expedited review.
Can Clovis require a discretionary permit for my rooftop solar system instead?
Only if the Building Official finds, based on substantial evidence, that the system could have a specific, adverse impact on public health and safety; Section 8.14.06(a) then requires a use permit, which can be appealed to the City of Clovis Appeals Board.
Does my HOA have to approve my solar permit application in Clovis?
No. Section 8.14.06(f) bars the City from conditioning approval of a solar energy system application on approval by a homeowners' association.
What size solar system qualifies for Clovis's expedited permit process?
Section 8.14.02(f) limits eligibility to systems no larger than 10 kilowatts AC nameplate rating (or 30 kilowatts thermal) installed on a single or duplex-family dwelling and not exceeding the City's maximum legal building height.

Sources & Official References

Other rules in Clovis

All Clovis rules

California rules heatmap·Compare Clovis to another location·View the California solar energy overview

Get notified when Expedited Solar Permitting in Clovis, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.