Skip to main content
CityRuleLookup

Centennial, CO Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Roof-mounts
Permitted on any building, all districts
Ground-mounts
Must meet accessory-building setbacks
Grid-tied systems
Interconnect agreement required first
Governing code
LDC § 12-3-607

Summary

Centennial's Land Development Code allows roof-mounted solar panels on any building in every zoning district, but ground-mounted photovoltaic arrays must meet accessory-building setbacks and grid-tied systems need a signed interconnect agreement before hookup.

B.Interconnect Agreements Required. If a photovoltaic array...is to be interconnected to the electric utility grid, proof of an executed interconnect agreement shall be provided before the system is interconnected. ... C.1.Roof-Mounts. Photovoltaic arrays may be roof-mounted on principal and accessory buildings in all districts.2.Ground-Mounts. Ground or structure-mounted photovoltaic arrays (not mounted on buildings) shall be set back as if they were detached accessory buildings.

Full Breakdown

Section 12-3-607 of the Centennial Land Development Code treats photovoltaic arrays as accessory improvements: roof-mounts on principal or accessory buildings are permitted in every zoning district with no separate use approval, while ground- or structure-mounted arrays must observe the same setbacks required for a detached accessory building. Carports and covered walkways in multifamily developments may be topped with panels regardless of where they sit on the parcel. Before any system that ties into the electric grid is energized, the owner must supply proof of an executed interconnect agreement with the utility, and the installation cannot be operated as a commercial power-generation enterprise under Public Utilities Commission rules.

Violations & Fines

Ground-mounted arrays placed inside the required accessory-building setback, or grid-tied systems energized without a filed interconnect agreement, are code violations the Community Development Director can require corrected before final inspection.

Frequently Asked Questions

Do I need city approval to put solar panels on my roof in Centennial?
Roof-mounted photovoltaic arrays are permitted on principal or accessory buildings in every zoning district under Section 12-3-607; a building permit still applies, but no special land-use approval is required.
Can I put my solar panels on the ground instead of the roof?
Yes, but ground- or structure-mounted arrays are treated like detached accessory buildings and must meet the same setback from property lines an accessory structure would.

Sources & Official References

Other rules in Centennial

All Centennial rules

Compare Centennial to another location·View the Colorado solar energy overview

Get notified when Panel Permits in Centennial, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Arapahoe County handle panel permits.

Aurora, CO
Some Restrictions