Aurora requires building and electrical permits for rooftop solar installations, typically issued within 2-3 weeks; most residential systems qualify for expedited review.
Solar photovoltaic (PV) installations in Aurora require a combined building and electrical permit through the Building Division. Residential rooftop systems under 25 kW typically qualify for expedited SolarAPP+ online review with same-day or next-day issuance for standard configurations. Applications require a site plan, structural verification, electrical one-line diagram, and equipment specs. Xcel Energy interconnection approval is also required. Permit fees for a typical 5-8 kW residential system run 200 to 500 dollars. Inspections include rough electrical, structural, and final. Ground-mount systems have setback and height requirements under zoning code.
Specific penalty amounts for this ordinance are not published in a publicly accessible fine schedule. Contact Aurora code enforcement directly for current fines, enforcement procedures, and hearing options.
Aurora, CO
Aurora imposes no general restriction on year-round lawn ornaments, statuary, or religious displays on private residential property. The Sign Code in UDO 146...
Aurora, CO
Aurora has no ordinance specifically regulating residential inflatable holiday displays. Size, motor noise, and lighting hours are not capped by the city for...
Aurora, CO
Aurora has no ordinance limiting the duration, brightness, or hours of residential holiday lighting on private property. The Aurora UDO Section 146-4.9 (Exte...
Aurora, CO
An outdoor kitchen in Aurora typically requires a building permit when it exceeds 120 sq ft, includes a roof or pergola, or is attached to the house. Gas lin...
Aurora, CO
Aurora has no code section specifically targeting residential smokers, pellet grills, or wood-fired ovens beyond the general IFC 308 open-flame rules adopted...
Aurora, CO
Aurora adopts the 2021 International Fire Code under Aurora City Code Chapter 66 (Fire Prevention and Protection). IFC 308.1.4 prohibits charcoal burners, pr...
See how Aurora's panel permits rules stack up against other locations.