Cherry Hill, NJ Solar Energy: Panel Permits (2026)
Key Facts
- Permit fee, up to 50 kW
- $65
- Permit fee, 51-100 kW
- $129
- Permit fee, over 100 kW
- $640
- Height exception
- up to 10% over zone max height
- Fee schedule section
- § 13-1.4a3(f) Electrical Subcode
Summary
Cherry Hill Township permits residential and commercial solar installations through the Electrical Subcode, with photovoltaic system fees tiered by system size under § 13-1.4a3(f): $65 for systems up to 50 kilowatts, $129 up to 100 kilowatts, and $640 above that. The Zoning Ordinance separately exempts solar panels from height limits.
Photovoltaic Systems 1-50K $ 65.00 51-100K $129.00 >100K $640.00
Full Breakdown
4a3(f) prices the electrical permit for a photovoltaic system by capacity rather than by panel count or roof area: systems from 1 to 50 kilowatts cost $65, systems from 51 to 100 kilowatts cost $129, and any system over 100 kilowatts costs $640. 4a3, distinct from the general construction permit fee charged under the Building Subcode for the mounting structure itself. Beyond the electrical permit, Cherry Hill's Zoning Ordinance gives solar installations a specific dispensation from the district height limits that otherwise cap building height by zone.
Section 40-401G, titled Exceptions to height limitations, states that the height limitations of the Ordinance shall not apply to church spires, belfries, cupolas, domes, monuments, parapets, solar panels, chimneys, smokestacks, flagpoles, masts and aerials, barns, silos, stairways, elevator penthouses, stair towers, skylights, ventilating fans, air conditioning, mechanical infrastructure or similar equipment required to operate and maintain the building, which may be erected above the height limits prescribed by the Ordinance, but in no case shall such extension exceed 10% of the maximum height otherwise permitted in the zone.
In practice, a rooftop array in Cherry Hill can extend up to 10% above the district's maximum building height without triggering a variance for height alone, while the panels are still an accessory use cross-referenced elsewhere in Chapter 40's district sections to Solar energy infrastructure, per § 40-432C, a supplemental-standards section that governs setback and screening details but was not present in the code file reviewed for this record.
Violations & Fines
An electrical permit issued without the correct photovoltaic fee tier, or a solar array installed without any electrical permit, falls under the Township's general penalty at § 1-5.1 in the absence of a solar-specific fine: up to $2,000, 90 days imprisonment, or 90 days of community service. An installation that exceeds the 10% height allowance in § 40-401G would need a zoning variance rather than qualifying for the automatic exception.
Frequently Asked Questions
How much is a solar panel permit fee in Cherry Hill Township?
Can solar panels exceed Cherry Hill's height limits?
Is there a separate zoning standard for solar installations?
Sources & Official References
Other rules in Cherry Hill
Compare Cherry Hill to another location·View the New Jersey solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.