Colonie, NY Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Rooftop onsite solar
exempt from site plan review
Ground-mounted lot coverage cap
50% (accessory use)
Solar farm min. lot size
20,000 sq ft
Solar farm lot coverage cap
60%
Decommissioning security
at least 125% of removal cost
Adopted
L.L. No. 2-2017, 3-23-2017

Summary

Town of Colonie Code § 190-51 permits roof-mounted solar panels that primarily serve the home as an accessory use in every zoning district and exempts them from site plan review, while ground-mounted systems face height, setback and a 50% lot-coverage cap, and solar farms over 20,000 square feet need a Planning Board special use permit.

E. Solar as an accessory use or structure. (1) Roof-mounted solar energy systems. (a) Roof-mounted solar energy systems that use the energy primarily onsite are permitted as an accessory use in all zoning districts when attached to any lawfully permitted residential building. ... (e) Roof-mounted solar energy systems that use the energy primarily onsite shall be exempt from site plan review. (2) Ground-mounted solar energy systems. ... (c) Lot coverage. Systems are limited to 50% lot coverage. The surface area covered by ground-mounted solar energy systems shall be included in total lot coverage... (d) Ground-mounted solar energy systems that use the energy primarily onsite shall be exempt from site plan review.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4902401; v37 updated 2026-05-28; through 05-28-2026).

Full Breakdown

Adopted March 23, 2017 by Local Law No. 2-2017 under Town Law §§ 261-263, § 190-51 splits solar installations into three tiers. Roof-mounted systems that use energy primarily onsite are permitted as an accessory use in all zoning districts when attached to any lawfully permitted residential building, cannot exceed the underlying district's height limit, must sit flush to the roof surface where possible, and are exempt from site plan review under subsection E(1)(e), the biggest practical break in the section: a homeowner installing rooftop panels for their own use does not need Planning Board sign-off.

Ground-mounted systems used primarily onsite are permitted as accessory structures only in designated zoning districts, must meet the underlying district's height and setback rules, and are capped at 50% lot coverage, with panel area counted toward that limit; like rooftop systems for onsite use, they are exempt from site plan review under E(2)(d). The largest tier, solar farms on lots of 20,000 square feet or more, requires a special use permit from the Planning Board under § 190-57 plus site plan review, and the application must include a professional engineer's layout, equipment specification sheets, an operation and maintenance plan, and a decommissioning plan backed by security funds equal to at least 125% of removal and restoration costs.

Solar farms are further limited to a 20-foot maximum panel height, minimum 50-foot setbacks (100 feet from residential districts), a 20,000-square-foot minimum lot size, 60% lot coverage, and a 20-foot vegetated buffer.

Violations & Fines

Installing a ground-mounted residential system beyond 50% lot coverage, or building a solar farm without the Planning Board's special use permit, engineer-certified decommissioning plan and funded decommissioning security, violates § 190-51; the Zoning Board of Appeals and Town Engineer can withhold approval, and no building permit may issue under subsection G(1) until a satisfactory decommissioning plan and security are in place.

Frequently Asked Questions

Do I need Planning Board approval to put solar panels on my roof in Colonie?
No. Section 190-51E(1)(e) exempts roof-mounted solar energy systems that primarily serve the home itself from site plan review, as long as the panels are attached to a lawfully permitted residential building and stay within the district's height limit. You still need to comply with New York State building codes.
How much of my lot can a ground-mounted solar system cover?
Up to 50% lot coverage for a residential accessory ground-mounted system, per § 190-51E(2)(c). The panel array's footprint counts toward that 50% figure, and the installation must also satisfy the underlying zoning district's greenspace and parking requirements.
What does a large solar farm need beyond a permit?
A solar farm on a lot of 20,000 square feet or more needs a Planning Board special use permit plus a decommissioning plan prepared by a professional engineer, backed by a decommissioning security of at least 125% of the estimated removal and restoration cost, held in escrow with the Town Clerk under § 190-51F and G.

Sources & Official References

Other rules in Colonie

All Colonie rules

New York rules heatmap·Compare Colonie to another location·View the New York solar energy overview

Get notified when Panel Permits in Colonie, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Albany County handle panel permits.

Albany, NY
Some Restrictions