Howell, NJ Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Solar racking fee
$150 for R-3 and R-5; other use groups by cost of work
PV array up to 10 KW
$225 for R-5 and R-3
Above 10 KW
$25 for each KW or portion
Solar facility minimum lot
65 acres under § 188-98.3
Conditional use zones
ARE-3, ARE-4 and ARE-6 only
Category One buffer
Three-hundred-foot buffer

Summary

Howell Township charges $150 for an R-3 or R-5 solar racking system and $225 for an R-5 or R-3 photovoltaic array up to 10 KW, plus $25 for each KW or portion above 10 KW. Township Code § 139-86 sets both fees, and other use groups are priced by cost of work.

(l) R-3 and R-5 solar racking system: $150; all other use groups: calculated based upon cost of work. ... (b) Electrical devices (This includes transformers, generators and PV devices.). [1] Fees. Size (kilowatts) Fee Greater than 1 but less than or equal to 10 $25 Greater than 10 but less than or equal to 45 $65 Greater than 45 but less than or equal to 112.5 $150 Greater than 112.5 $500 R-5 and R-3 photovoltaic (PV) array systems up to 10 KW $225 For each KW (or portion) above 10 KW $25

Full Breakdown

Solar permit fees in Howell Township sit in the Uniform Construction Code fee schedule of § 139-86 of the Township Code, enforced by the Construction Office under Chapter 108. Two lines apply to panels. Under the building subcode, an R-3 and R-5 solar racking system costs $150, while every other use group is calculated based upon cost of work. Under the electrical subcode, PV devices are listed with transformers and generators as electrical devices, and R-5 and R-3 photovoltaic (PV) array systems up to 10 KW cost $225, with $25 for each KW (or portion) above 10 KW. The code asks for the actual nameplate KW rating on the application to assure no delay in permit issuance. The general electrical minimum fee is $85 for R-5 and R-3 and $150 for all other use groups.

Larger installations also face zoning. Section 188-69 lists a solar energy generation facility as a conditional use in the ARE-3, ARE-4 and ARE-6 zones only, and § 188-98.3 sets a minimum lot area of 65 acres. The code defines a solar energy generation facility as a system of fuel cells, solar or photovoltaic panels and equipment, or an area of land principally used to convert solar energy to electricity.

Design standards printed for those facilities require emergency vehicle access to ground-mounted components as per the New Jersey State Fire Code, Section 305, and bar occupying NJDEP-regulated floodplains, flood hazard areas, wetlands, wetland transition areas or riparian corridors without an NJDEP permit. A three-hundred-foot buffer applies to Category One waters, including the Metedeconk River and the Manasquan Reservoir. Facilities must be screened from public roads and preserved farmland. A facility not in active and continuous service for one year must be removed under a decommissioning plan, which requires a demolition permit from the Howell Township construction official and a performance bond, cash or letter of credit.

Violations & Fines

The fee lines carry no penalty of their own. Removal of an abandoned solar facility requires a demolition permit from the Howell Township construction official and a bond, cash or letter of credit, and the work must be done by an electrician licensed in New Jersey. Construction Office decisions are appealed to the Monmouth County Construction Board of Appeals under § 108-2.

Frequently Asked Questions

How much is a residential solar racking permit in Howell Township?
Section 139-86A(3)(l) of the Howell Township Code sets $150 for an R-3 and R-5 solar racking system. Other use groups are calculated based upon cost of work. The racking fee is a building subcode item and is separate from the electrical subcode fee for the PV array.
What is the electrical fee for a rooftop PV array in Howell Township?
Section 139-86C lists R-5 and R-3 photovoltaic (PV) array systems up to 10 KW at $225, plus $25 for each KW (or portion) above 10 KW. The application must show the actual nameplate KW rating so the permit is not delayed.
Does Howell Township regulate where large solar facilities can go?
Yes. Section 188-69 allows a solar energy generation facility as a conditional use in the ARE-3, ARE-4 and ARE-6 zones only, and § 188-98.3 requires a minimum lot area of 65 acres. Design standards add screening, emergency vehicle access, a decommissioning plan, and a three-hundred-foot Category One waters buffer.
What happens when a Howell solar facility is abandoned?
A solar or PV facility not in active and continuous service for one year must be removed under a decommissioning plan. Removal needs a demolition permit from the Howell Township construction official, and the owner or operator must post a performance bond, cash or letter of credit first. A New Jersey licensed electrician must do the removal.

Sources & Official References

Other rules in Howell

All Howell rules

Compare Howell to another location·View the New Jersey solar energy overview

Get notified when Panel Permits in Howell, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in this county handle panel permits.

Long Branch, NJ
Some Restrictions