Howell, NJ Solar Energy: Panel Permits (2026)
Key Facts
- Solar racking fee
- $150 for R-3 and R-5; other use groups by cost of work
- PV array up to 10 KW
- $225 for R-5 and R-3
- Above 10 KW
- $25 for each KW or portion
- Solar facility minimum lot
- 65 acres under § 188-98.3
- Conditional use zones
- ARE-3, ARE-4 and ARE-6 only
- Category One buffer
- Three-hundred-foot buffer
Summary
Howell Township charges $150 for an R-3 or R-5 solar racking system and $225 for an R-5 or R-3 photovoltaic array up to 10 KW, plus $25 for each KW or portion above 10 KW. Township Code § 139-86 sets both fees, and other use groups are priced by cost of work.
(l) R-3 and R-5 solar racking system: $150; all other use groups: calculated based upon cost of work. ... (b) Electrical devices (This includes transformers, generators and PV devices.). [1] Fees. Size (kilowatts) Fee Greater than 1 but less than or equal to 10 $25 Greater than 10 but less than or equal to 45 $65 Greater than 45 but less than or equal to 112.5 $150 Greater than 112.5 $500 R-5 and R-3 photovoltaic (PV) array systems up to 10 KW $225 For each KW (or portion) above 10 KW $25
Full Breakdown
Solar permit fees in Howell Township sit in the Uniform Construction Code fee schedule of § 139-86 of the Township Code, enforced by the Construction Office under Chapter 108. Two lines apply to panels. Under the building subcode, an R-3 and R-5 solar racking system costs $150, while every other use group is calculated based upon cost of work. Under the electrical subcode, PV devices are listed with transformers and generators as electrical devices, and R-5 and R-3 photovoltaic (PV) array systems up to 10 KW cost $225, with $25 for each KW (or portion) above 10 KW. The code asks for the actual nameplate KW rating on the application to assure no delay in permit issuance. The general electrical minimum fee is $85 for R-5 and R-3 and $150 for all other use groups.
Larger installations also face zoning. Section 188-69 lists a solar energy generation facility as a conditional use in the ARE-3, ARE-4 and ARE-6 zones only, and § 188-98.3 sets a minimum lot area of 65 acres. The code defines a solar energy generation facility as a system of fuel cells, solar or photovoltaic panels and equipment, or an area of land principally used to convert solar energy to electricity.
Design standards printed for those facilities require emergency vehicle access to ground-mounted components as per the New Jersey State Fire Code, Section 305, and bar occupying NJDEP-regulated floodplains, flood hazard areas, wetlands, wetland transition areas or riparian corridors without an NJDEP permit. A three-hundred-foot buffer applies to Category One waters, including the Metedeconk River and the Manasquan Reservoir. Facilities must be screened from public roads and preserved farmland. A facility not in active and continuous service for one year must be removed under a decommissioning plan, which requires a demolition permit from the Howell Township construction official and a performance bond, cash or letter of credit.
Violations & Fines
The fee lines carry no penalty of their own. Removal of an abandoned solar facility requires a demolition permit from the Howell Township construction official and a bond, cash or letter of credit, and the work must be done by an electrician licensed in New Jersey. Construction Office decisions are appealed to the Monmouth County Construction Board of Appeals under § 108-2.
Frequently Asked Questions
How much is a residential solar racking permit in Howell Township?
What is the electrical fee for a rooftop PV array in Howell Township?
Does Howell Township regulate where large solar facilities can go?
What happens when a Howell solar facility is abandoned?
Sources & Official References
Other rules in Howell
Compare Howell to another location·View the New Jersey solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.