Key Facts
- Permit required
- construction + zoning permit
- Residential ground setback
- 5-10 ft from property lines
- Max height (residential)
- 6 feet
- Site plan approval expires
- 24 months
- Abandonment trigger
- 12 months out of service
- Adopted
- 5-27-2014, Ord. No. 14-14
Summary
Every solar energy system in Long Branch, roof- or ground-mounted, needs both a construction permit and a zoning permit before installation under Code § 320-5, adopted in 2014. Site plan approval is generally required too and expires if the system isn't running within 24 months.
All solar energy systems require a construction and zoning permit prior to installation. Applications for a solar energy system shall include information demonstrating compliance with the provisions of this article including the following: ... Site plan approval shall expire if the solar energy system is not installed and functioning within 24 months from the date of approval or if the solar energy system is abandoned as provided for in this article.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4904719; v48 updated 2026-06-10; through 06-10-2026).
Full Breakdown
Chapter 320, Article I governs solar energy systems installed after its 2014 adoption, including upgrades that materially change an existing system's size or placement (§ 320-3A). Applicants must submit manufacturer specifications for every system component along with scaled elevation drawings; for pitched roofs the drawings must show the collector's highest finished slope against the roof's own slope and its distance from the roof edge, while flat-roof systems must show the distance to the roof edge, any parapets, and the building's and collector's finished heights (§ 320-5A).
Ground-mounted accessory systems in residential districts must sit back at least 5 feet from property lines if 100 square feet or smaller, or 10 feet if larger, cannot exceed 6 feet in height, and cannot cover more than half the principal building's footprint (§ 320-4B). Site plan approval is required for all ground-mounted accessory systems, solar energy production facilities, and solar carports, including a visual analysis from at least three vantage points, and that approval expires if the system isn't installed and functioning within 24 months, or if it is later abandoned (§ 320-5B).
Single- and two-family homes installing ground-mounted accessory systems are exempt from site plan review but still must submit a property survey showing the system's location with their permit application (§ 320-5B(3)). Systems on designated historic buildings must also be referred to the Long Branch Historic Commission (§ 320-5C), and before installation the owner must give the Construction Official or Zoning Officer written proof the utility company has been told about the interconnection (§ 320-5D).
Violations & Fines
A system left out of service for a full twelve months is deemed abandoned; the Zoning Officer can issue a notice of abandonment, and the owner has 30 days to prove otherwise. If abandonment stands, the owner must remove the system and related equipment within 90 days at their own expense after first obtaining a demolition permit, or the City can sue to force removal at the owner's cost (§ 320-5F).
Frequently Asked Questions
Do I need a permit to install rooftop solar panels in Long Branch?
How tall can a ground-mounted solar array be in a Long Branch residential yard?
When is a Long Branch solar system considered abandoned?
Does a single-family homeowner need full site plan approval for solar panels?
Sources & Official References
Other rules in Long Branch
Compare Long Branch to another location·View the New Jersey solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.