Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Lot size
25 to 100 vacant acres
Max height
15 feet for array and buildings
Fence
6-foot security fence minimum
Permit term
Use Permit renewed annually
Abandonment
Declared after 1 year no production
Removal deadline
120 days after abandonment
Ownership change
New owner needs a new Use Permit

Summary

Jackson requires a Use Permit for any solar energy production facility under Zoning Ordinance Section 1007-A. Ground-mounted arrays need 25 to 100 vacant acres, a 15-foot height cap, a 6-foot security fence, and a decommissioning plan filed with the Use Permit application, which must be renewed every year.

1. The minimum lot size for a solar energy production facility shall be twenty-five (25) vacant acres and a maximum of one-hundred vacant acres... 3. The maximum height for a solar array and related building shall be fifteen (15) feet... 6. Prior to preliminary site plan approval or construction plan the applicant shall submit proof of notice to the utility company that operates the power grid where the solar energy production facility will be located of the intent to develop an interconnected power generation facility. 7. Prior to site construction plan approval, the applicant shall submit proof of an executed interconnection agreement with the utility or other written proof of an agreement with the utility that construction can proceed... 10. A decommissioning plan must be submitted with the Use Permit application. 11. The Use Permit shall be renewed annually and subsequent owners of a solar energy production facility at the location must apply for and receive a new Use Permit.

View official code

Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.

Full Breakdown

Section 1007-A of the City of Jackson Zoning Ordinance (amended through December 19, 2024) governs solar energy production facilities citywide. The minimum lot size is twenty-five vacant acres, capped at one hundred vacant acres, with a perimeter buffer area of one percent or as set by the Site Plan Review Committee. Solar arrays and related buildings are limited to a maximum height of fifteen feet. Ground-mounted equipment must sit inside a security fence at least six feet high, built to the location and height standards of Section 1102-A, and the fence or site perimeter must carry clearly visible high-voltage warning signs.

Before preliminary site plan approval, the applicant must give the utility operating the local power grid written notice of intent to develop an interconnected facility; before construction plan approval, the applicant must submit proof of an executed interconnection agreement or other written proof the utility will allow construction to proceed. A decommissioning plan is a mandatory part of the Use Permit application itself, not a separate filing. The Use Permit is not permanent: it must be renewed annually, and if the property changes hands, the new owner has to apply for and receive its own Use Permit rather than inherit the seller's.

A facility is deemed abandoned after a full year without energy production, and once abandoned the operator and property owner are jointly responsible for removing all production and transmission equipment and appurtenances within 120 days.

Violations & Fines

Section 1007-A ties enforcement to the abandonment clock rather than a fine schedule: a facility with no energy production for one year is declared abandoned, and the operator and property owner must remove all production and transmission equipment within 120 days of that finding. Because the Use Permit itself lapses without annual renewal and does not transfer on sale, operating past expiration or after a change of ownership without a new Use Permit leaves the facility unpermitted under the Site Plan Review Committee's approval.

Frequently Asked Questions

Does Jackson require a permit for a solar energy production facility?
Yes. Zoning Ordinance Section 1007-A requires a Use Permit for any solar energy production facility, and the application must include a decommissioning plan. The Use Permit must be renewed every year and does not transfer automatically to a new owner if the property is sold.
How much land does a solar energy facility need in Jackson?
Section 1007-A sets a minimum of twenty-five vacant acres and a maximum of one hundred vacant acres for a solar energy production facility, plus a perimeter buffer area of one percent or whatever amount the Site Plan Review Committee determines is needed.
What happens if a solar facility in Jackson stops operating?
Under Section 1007-A, the facility is considered abandoned after one full year without energy production. At that point the operator and the property owner are both responsible for removing all production and transmission equipment and appurtenances within 120 days.
Do I need to notify the utility company before building?
Yes. Section 1007-A requires proof of notice to the utility operating the power grid before preliminary site plan approval, and proof of an executed interconnection agreement, or other written proof the utility will allow construction, before construction plan approval.

Sources & Official References

Other rules in Jackson

All Jackson rules

Compare Jackson to another location·View the Mississippi solar energy overview

Get notified when Panel Permits in Jackson, MS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.