Key Facts

Governing ordinance
Medford Revised Ordinances §§ 10-105 to 10-109
Adopted
October 22, 2019, Ord. No. 848
Roof coverage required
At least 50% of roof area
Parking structure coverage
At least 90% of top level
Reviewing official
Director of energy and environment
Triggering project size
10,000+ sq ft or 10+ units

Summary

In the City of Medford, Massachusetts, § 10-106 of the Revised Ordinances requires large residential and nonresidential construction projects to install a solar energy system covering at least 50 percent of roof area, with an uncovered parking structure needing solar coverage on 90 percent of its top level. The director of energy and environment reviews the required assessment before a building permit issues.

Sec. 10-106. - Requirements. The following projects shall include a solar energy system that is equivalent to a minimum of 50 percent of the roof area of all buildings. In cases where a site includes an uncovered parking structure the structure shall also have a solar energy system installed to cover a minimum of 90% of its top level. These projects are: (1)Residential projects containing ten or more units; including conversions of existing dwellings to contain ten or more units; ... ... Sec. 10-107. - Solar energy system assessment. ... (4)A final solar installation plan must be reviewed and approved by the director of energy and environment prior to the issuance of a building permit. ... ... Sec. 10-109. - Safety and locations guidelines. ( ... b)Safety. ... No roof-mounted solar energy system shall be located in a manner that would cause the shedding of ice or snow from the roof into a porch, stairwell or pedestrian travel area.

Full Breakdown

Medford's Article VI solar energy ordinance, added to Chapter 10 by Ordinance No. 848 on October 22, 2019, applies to four project types: residential developments of ten or more units, including conversions that create ten or more units; new construction or additions of 10,000 square feet or more of floor area; changes in practical use of an existing building of that size; and substantial rehabilitations, defined in § 10-105 as work costing more than 50 percent of a structure's assessed value, on buildings of the same size.

Under § 10-106, each covered project must install a solar energy system equal to at least 50 percent of total roof area, and any uncovered parking structure on the site must carry solar coverage on a minimum of 90 percent of its top level. Section 10-107 requires an initial solar assessment analyzing layout and annual production to be filed with the site plan review application under Chapter 94, Article VI, and a final solar installation plan must be reviewed and approved by the director of energy and environment before the building commissioner issues a building permit.

Section 10-108 lets the director waive or reduce the requirement where there is no usable solar-ready zone, where shading covers more than half of daylight hours annually, or where a conversion lacks the structural capacity to carry panels. Section 10-109 adds safety conditions: systems must preserve fire department roof access and egress pathways, and roof-mounted panels cannot be positioned so that shedding snow or ice falls into a porch, stairwell or pedestrian walkway.

Violations & Fines

The solar ordinance carries no stand-alone fine schedule of its own. Because § 10-106 compliance is a condition of site plan review and the building permit under Chapter 94, Article VI, the building commissioner and director of energy and environment can withhold approval of the assessment or the building permit for a noncompliant project, and any violation otherwise defaults to the § 1-13 general penalty of up to $300.00 per offense, with continuing violations counted daily.

Frequently Asked Questions

Which Medford projects must install solar panels?
Section 10-106 covers residential projects of ten or more units, new construction or additions of 10,000 square feet or more, changes in use of buildings that size, and substantial rehabilitations of the same scale. Each must install a solar energy system covering at least 50 percent of the roof area, and any uncovered parking structure on site needs solar over 90 percent of its top level.
Can a project skip Medford's solar requirement?
Section 10-108 allows the director of energy and environment to waive or reduce the mandate when there is no viable solar-ready zone, when shading blocks more than half of annual daylight hours, or when a building conversion cannot bear the structural load, but the exemption is discretionary and decided before the building permit issues.
What review does a solar installation need before construction?
Section 10-107 requires an initial solar assessment covering layout and annual production filed with the Chapter 94, Article VI site plan review application, followed by a final solar installation plan that the director of energy and environment must approve before the building commissioner issues the building permit.

Sources & Official References

Other rules in Medford

All Medford rules

Compare Medford to another location·View the Massachusetts solar energy overview

Get notified when Panel Permits in Medford, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.