Key Facts

Permit required
To install or modify solar PV
Governing law
Fire Code § 105.7.13 (Ch. 46)
Solar collector array fee
$11.35 (plumbing permit)
Solar storage tank fee
$7.95 (plumbing permit)
Minimum plumbing permit fee
$22.70

Summary

Omaha requires a construction permit before any solar photovoltaic system is installed or modified anywhere in the city.

105.7.13 Solar photovoltaic power systems. A construction permit is required to install or modify solar photovoltaic power systems.

Source: City of Omaha Permits and InspectionsView official code

Full Breakdown

The Fire Code of the City of Omaha, adopted under Chapter 46 of the Omaha Municipal Code, amends Section 105.7 of the International Fire Code to add subsection 105.7.13, which flatly requires a construction permit to install or modify a solar photovoltaic power system. This is on top of the standard building permit review by the Permits and Inspections Division. Separately, if a solar installation ties into plumbing (a solar thermal collector array or an associated storage tank), the Plumbing Code fee schedule at Sec. 49-304 sets a specific permit fee for that equipment: $11.35 per solar collector array and $7.95 per storage tank incorporated into a solar energy system, on top of the $22.70 minimum permit fee. Homeowners installing rooftop PV panels should expect to pull both an electrical/building permit and, if fire code triggers apply, a fire code construction permit before work begins.

Violations & Fines

Installing or modifying a solar PV system without the required construction permit is a code violation subject to the general penalty provisions for unpermitted work under the Fire Code and Building Code, including stop-work orders and fines.

Frequently Asked Questions

Does Omaha require a permit for rooftop solar panels?
Yes. Fire Code § 105.7.13 requires a construction permit to install or modify any solar photovoltaic power system in the city.
Is there an extra fee if my solar system uses a storage tank or collector array?
Yes. Omaha's plumbing fee schedule charges $11.35 per solar collector array and $7.95 per solar storage tank under Sec. 49-304.

Sources & Official References

Other rules in Omaha

All Omaha rules

Compare Omaha to another location·View the Nebraska solar energy overview

Get notified when Panel Permits in Omaha, NE changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.