Key Facts

Governing section
138-10.401
Rooftop height above roof surface
4 feet max
Ground-mount height at max tilt
10 feet max
Front-yard ground system height
42 inches max
Side/rear setback (ground)
5 feet minimum
Max lot coverage (ground)
20 percent
Removal deadline after 12 months idle
90 days

Summary

Rochester Hills requires a building permit for both rooftop and ground-mounted solar energy systems in every zoning district. Roof systems cannot rise more than four feet above the roof surface or overhang the edge, while ground systems face a ten-foot height cap, side and rear setbacks, and a 20 percent lot-coverage limit.

B.Rooftop Solar Energy Systems. Rooftop and building mounted solar energy systems are permitted in all zoning districts., subject to the following regulations:1.Roof mounted systems shall not extend more than four feet above the surface to which it is affixed.2.No solar energy system may protrude beyond the edge of the roof.3.A building permit shall be required for installation of rooftop and building mounted systems.C.Ground Mounted Solar Energy Systems. Ground mounted solar energy systems, temporary and permanent, are permitted in all zoning districts, subject to the following regulations:1.Location. The solar energy system shall meet the required front yard setback requirement for the district in which it is located, and be set back a minimum of five feet from any side or rear property line.2.Height.a.The height of the solar energy system and any mounts shall not exceed ten feet when oriented at maximum tilt. ... 3.Building Permit. A building permit shall be required for any ground mounted solar energy system.

Full Breakdown

Section 138-10.401 governs solar energy systems citywide. Paragraph B permits rooftop and building-mounted systems in all zoning districts, but paragraph B.1 caps how far a roof-mounted system can extend above the roof surface it is affixed to at four feet, paragraph B.2 bars any system from protruding past the roof's edge, and paragraph B.3 requires a building permit before installation. Paragraph C permits ground-mounted systems, temporary or permanent, in all zoning districts subject to more detailed standards: paragraph C.1 requires the system to meet the district's required front yard setback and keep at least five feet from any side or rear property line; paragraph C.2.a caps height at ten feet when the panels are at maximum tilt, while paragraph C.2.b drops that cap to 42 inches for a system placed between the required front setback line and the front building wall, with evergreen landscaping required to buffer it from view without blocking sun exposure; paragraph C.3 requires a building permit for any ground-mounted installation; and paragraph C.4 caps ground coverage at 20 percent of the total lot area.

Paragraph D requires solar storage batteries to be kept in a secure container while in use and disposed of under applicable law once retired. Paragraph E requires removal of a system that stops functioning for more than 12 consecutive months, with the property owner given 90 days after that 12-month period ends to take the equipment down.

Violations & Fines

Installing a rooftop or ground-mounted system without the required building permit, or beyond the height, setback or coverage limits of Section 138-10.401, is enforced as a municipal civil infraction under Section 138-1.401, drawing a $70 fine for a first violation, $150 for a first repeat and $500 for a second or subsequent repeat under Section 66-37. Failing to remove a system that has sat non-functional for more than 12 months within the 90-day window set by paragraph E is a separate, continuing violation, with each day counted separately under Section 138-1.405.

Frequently Asked Questions

Do I need a permit to install solar panels on my roof in Rochester Hills?
Yes. Section 138-10.401.B.3 requires a building permit for any rooftop or building-mounted solar energy system, and the panels cannot extend more than four feet above the roof surface or protrude past the roof edge under paragraphs B.1 and B.2.
How close to my property line can I put a ground-mounted solar array?
Section 138-10.401.C.1 requires the array to meet your district's front yard setback and stay at least five feet from any side or rear property line, and paragraph C.4 caps the array at 20 percent of your total lot area.
Can I put solar panels in my front yard?
Only at a reduced height. Section 138-10.401.C.2.b limits a ground-mounted system placed between the required front setback line and the front building wall to 42 inches, and requires evergreen landscaping to screen it from neighboring view without shading the panels.
What happens if my solar system stops working and I never remove it?
Section 138-10.401.E requires removal of the collector, mounts and associated equipment no later than 90 days after the system has gone 12 consecutive months without performing its function, and missing that deadline is a separate zoning violation.

Sources & Official References

Other rules in Rochester Hills

All Rochester Hills rules

Compare Rochester Hills to another location·View the Michigan solar energy overview

Get notified when Panel Permits in Rochester Hills, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.