Sedona, AZ Solar Energy: Panel Permits (2026)
Key Facts
- Roof-mounted solar
- Fully exempt from screening
- Ground-mounted solar
- Exempt if screening cuts efficiency
- Governing section
- Sedona Land Development Code § 5.6(D)
- Permit still required
- Not on exempt-work lists
- New-construction wiring
- IRC Appendix T solar-ready rules
Summary
Sedona's land development code exempts solar energy equipment from the screening rules that apply to roof- and ground-mounted mechanical equipment elsewhere on a property, so panels and their hardware don't have to be hidden behind a parapet, wall or fence.
d. Facilities for the operation of active or passive solar energy systems and other alternate energy systems shall be exempt from the screening requirements. ... ... c. Screening of ground-mounted solar energy equipment is not required when it can be clearly demonstrated that required screening would reduce the efficiency or effectiveness of the solar energy equipment.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Initiative Ordinance 2026-01, approved by voters at the July 21, 2026 election).
Full Breakdown
Article 5's equipment-screening standards ordinarily require roof-mounted mechanical equipment to sit behind a parapet wall or similar architectural feature, and ground-mounted equipment like AC units, pool equipment and propane tanks to be located out of view or screened by a wall, fence or vegetative screen when visible from a public street, trail, open space or an adjacent property. Section 5.6(D)(1)(d) carves solar out of the roof-mounted rule entirely, exempting facilities for the operation of active or passive solar energy systems and other alternate energy systems from the screening requirements. Section 5.6(D)(2)(c) does the same for ground-mounted panels, but with a case-by-case standard: screening isn't required when it can be clearly demonstrated that required screening would reduce the efficiency or effectiveness of the solar energy equipment.
That screening exemption doesn't replace the building and electrical permit a solar installation still needs. Solar equipment isn't on the short exempt-work lists at SCC §§ 15.05.020(C) or 15.05.040(D), so an installation goes through the standard building permit process under the adopted International Building or Residential Code, with the wiring inspected under the 2017 National Electrical Code adopted at SCC § 15.15.010. New one- and two-family construction also has to include IRC Appendix T's solar-ready wiring provisions, adopted at SCC § 15.05.030(A)(13).
Violations & Fines
Installing solar equipment without the required building and electrical permits is enforced the same way as any other unpermitted construction: SCC § 1.15.010 treats each day of unpermitted work as a separate offense, and the city can issue a stop-work order. The screening exemption itself carries no penalty because it removes a requirement rather than imposing one; a ground-mounted system denied the exemption for lack of proof can still be required to screen like any other mechanical equipment.
Frequently Asked Questions
Do I have to screen solar panels from view in Sedona?
Do I still need a permit to install solar panels?
Does new construction in Sedona have to be solar-ready?
Sources & Official References
Other rules in Sedona
Compare Sedona to another location·View the Arizona solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.