Key Facts

Zoning rule
Rooftop solar panels shall be permitted (§ 134-87)
Fire subcode fee, detached Group R-5
$100
Fire subcode fee, all other groups
$250
Electrical fee, photovoltaic to 50 kW
$91
Electrical fee, photovoltaic above 100 kW
$896
When fees are due
Before a permit can be issued

Summary

In Wayne Township, Passaic County, New Jersey, § 134-87 states that rooftop solar panels shall be permitted, and § 64-2 sets the construction permit fees: $100 for photovoltaic and thermal panels on a detached Group R-5 building, $250 for all other groups, plus electrical subcode fees by system size.

A. Construction fee. The fee for a construction permit shall be the sum of the subcode fees listed in Subsection A(1) through (3) hereof and shall be paid before a permit can be issued. ... (r) Photovoltaic and thermal solar panels: (1) Detached Group R-5: $100. (2) All other groups: $250. ... (3) Photovoltaic systems: a. To 50 kilowatts: $91. b. To 100 kilowatts: $180. c. Above 100 kilowatts: $896.

Full Breakdown

Rooftop solar is allowed by right in Wayne Township. Section 134-87 of the Land Development chapter reads in full: Rooftop solar panels shall be permitted. The permit step runs through the Uniform Construction Code chapter, Chapter 64, which establishes the Division of Construction Code in the Township of Wayne, made up of the Construction Official, the Building Subcode Official, the Plumbing Subcode Official, the Fire Subcode Official, the Electrical Subcode Official and any other subcode officials. Section 64-1(C) gives the public the right to do business with the enforcing agency at one office location.

Section 64-2(A) sets the rule that the fee for a construction permit is the sum of the subcode fees listed in Subsection A(1) through (3) and must be paid before a permit can be issued. Two subcode schedules name solar equipment. In the Fire Protection Subcode fees, item (r), photovoltaic and thermal solar panels cost $100 for a Detached Group R-5 building and $250 for all other groups. In the Electrical Subcode fees, photovoltaic systems are priced by capacity: to 50 kilowatts, $91; to 100 kilowatts, $180; above 100 kilowatts, $896.

The building fee schedule also states that no fee is required for ordinary maintenance as the term is defined by regulations promulgated by the State of New Jersey. The fee article was amended 1-20-2021 by Ord. No. 1-2021 and again 2-5-2025 by Ord. No. 6-2025, so the dollar figures on this page track the 2025 amendment note printed in the code. Fee schedules in Chapter 64 are separate from the zoning rule in § 134-87: the zoning section answers whether panels are allowed, and § 64-2 answers what the permit costs.

Violations & Fines

Section 64-2 requires the construction fee to be paid before a permit can be issued, so panels cannot be permitted without the subcode fees. The fee excerpt prints no solar-specific fine. A rooftop installation that violates Chapter 134 itself is punishable under § 134-122(A) by a fine not exceeding $1,250, and a natural person can also face up to 90 days of imprisonment.

Frequently Asked Questions

Are rooftop solar panels allowed in Wayne Township NJ?
Yes. Section 134-87 of the Wayne Township Code states that rooftop solar panels shall be permitted. The section is a single sentence in the Land Development chapter, and the construction permit process and fees are handled separately under Chapter 64 and its Division of Construction Code.
What does a solar panel permit cost in Wayne Township?
Under § 64-2, the Fire Protection Subcode fee for photovoltaic and thermal solar panels is $100 for a detached Group R-5 building and $250 for all other groups. The Electrical Subcode adds a photovoltaic system fee of $91 to 50 kilowatts, $180 to 100 kilowatts, or $896 above 100 kilowatts.
When must the permit fee be paid in Wayne Township?
Section 64-2(A) says the construction permit fee is the sum of the subcode fees listed in Subsection A(1) through (3) and shall be paid before a permit can be issued. Payment therefore comes at application time, ahead of any work on the roof.
Who reviews solar permits in Wayne Township?
Section 64-1 establishes the Division of Construction Code in the Township of Wayne. It consists of the Construction Official, Assistant Construction Official, Building, Plumbing, Fire and Electrical Subcode Officials and any other subcode officials the Township adds. The Fire and Electrical subcodes carry the solar fees.

Sources & Official References

Other rules in Wayne

All Wayne rules

Compare Wayne to another location·View the New Jersey solar energy overview

Get notified when Panel Permits in Wayne, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Passaic County handle panel permits.

Paterson, NJ
Some Restrictions