Indiana Statewide Rule
Indiana NPDES Stormwater MS4 and Industrial Permits
Key Facts
- Governing statute
- IC 13-18-3
- Construction Rule 5 trigger
- 1 or more acres
- MS4 minimum measures
- Six required programs
- Permit issuer
- IDEM
- Maximum daily penalty
- Up to $25,000
Summary
Indiana's IDEM administers statewide NPDES stormwater permitting under IC 13-18-3 and 327 IAC 15, requiring MS4 communities, industrial sites, and dischargers to obtain coverage. Local programs must implement state minimum measures.
Sec. 6. The board has the powers and duties prescribed by IC 8-1.5-3-4(a). In addition, the board may: (1) hold hearings following public notice; (2) make findings and determinations; (3) install, maintain, and operate a storm water collection and disposal system; (4) make all necessary or desirable improvements of the grounds and premises under its control; and (5) issue and sell bonds of the district in the name of the unit served by the department for the acquisition, construction, alteration, addition, or extension of the storm water collection and disposal system or for the refunding of any bonds issued by the board.
Full Breakdown
Under IC 13-18-3 and Indiana Administrative Code Title 327 Article 15, IDEM issues general NPDES stormwater permits regulating municipal separate storm sewer systems (MS4s), construction sites disturbing one or more acres (Rule 5), and industrial activity (Rule 6). MS4 entities must implement six minimum control measures: public education, public involvement, illicit discharge detection and elimination, construction runoff control, post-construction stormwater management, and pollution prevention. Local stormwater ordinances must meet or exceed IDEM standards. Cities cannot reduce protections below the state floor, though they may add stricter local water-quality criteria.
Violations & Penalties
Discharging without an NPDES permit, failing to file Notice of Intent, or violating permit terms can trigger civil penalties up to $25,000 per day per violation under IC 13-30-4 and federal Clean Water Act enforcement.
Frequently Asked Questions
Does my city's stormwater ordinance preempt the state rule?
Do small construction projects need a permit?
Sources
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.