Medford, MA Swimming Pools & Spas: Pool Permits (2026)
Swimming pool permit rules in Medford, MA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.
Key Facts
- Building permit fee
- $15 per $1,000 cost, plus $35 application fee
- Electrical permit, inground pool
- $75.00
- Electrical permit, above-ground pool
- $50.00
- Pool setback
- 6 ft from rear/side lot lines, water's edge
- Pump equipment setback
- 12 ft from lot lines
- No-permit penalty
- Quadruple the normal permit fee
Summary
In the City of Medford, Massachusetts, installing a residential swimming pool requires a building permit under Section 10-35, priced at $15.00 per $1,000 of construction cost plus a $35.00 application fee, and a simultaneous electrical permit under Section 10-67 costing $75.00 for an inground pool or $50.00 for an above-ground unit.
Sec. 10-35. - Building permit and inspection fees. The building permit and inspection fees are included in appendix A of these Revised Ordinances. ... (c)Electrical permit applications for siding and pools must be submitted simultaneously with building permit applications. ... (1) Permit fees for new building; additions; alterations; and repairs: per $1,000.00 of estimated construction cost ..... 15.00 Application fee ..... 35.00 ... (14) Other permit fees: a. Swimming pools inground ..... 75.00 Above-ground (portable units) ..... 50.00 ... 4.A swimming pool must be set back a minimum six feet from rear and side lot lines measured from the water's edge to the lot lines, and a minimum setback of 12 feet from the lot lines for any type of pump equipment.
Full Breakdown
Medford's building code, Chapter 10 of the Revised Ordinances, treats a swimming pool as a structure requiring the same building permit process as any new construction. Section 10-35 sends applicants to the Appendix A fee schedule, where the general building permit fee is $15.00 per $1,000.00 of estimated construction cost plus a $35.00 application fee, calculated on the cost of installing the pool. Section 10-67(c) then requires that electrical permit applications for siding and pools be submitted simultaneously with building permit applications, meaning a homeowner cannot wait until construction is underway to add the electrical permit for pool bonding and equipment.
That electrical permit carries its own flat fee in Appendix A: $75.00 for an inground pool and $50.00 for an above-ground, portable unit. Once installed, the accessory structure standards in Section 94-4.3.2 require the pool itself to sit back at least six feet from the rear and side lot lines, measured from the water's edge, and require any pump equipment to sit back at least 12 feet from those same lot lines. The building commissioner reviews and issues both permits, and Section 10-67(a) adds that electrical work performed without notifying the superintendent of wires is subject to a separate $20.00 fine.
Starting pool construction without a building permit quadruples the normal permit fee under Appendix A's building fee schedule, a penalty that applies equally to pool work begun before permits are pulled.
Violations & Fines
Starting pool construction without a building permit quadruples the normal building permit fee under the Appendix A fee schedule. Failing to submit the required electrical permit for the pool at the same time as the building permit, per Section 10-67(c), or wiring the pool without notifying the superintendent of wires under Section 10-67(a), can draw a separate $20.00 fine plus reinspection charges.
Frequently Asked Questions
Do I need a separate electrical permit for a pool in Medford?
How much does a residential pool building permit cost in Medford?
How far from my property line must a pool be in Medford?
Sources & Official References
Other rules in Medford
Compare Medford to another location·View the Massachusetts swimming pools & spas overview