Skip to main content
CityRuleLookup

Medford, MA Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Medford, MA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Building permit fee
$15 per $1,000 cost, plus $35 application fee
Electrical permit, inground pool
$75.00
Electrical permit, above-ground pool
$50.00
Pool setback
6 ft from rear/side lot lines, water's edge
Pump equipment setback
12 ft from lot lines
No-permit penalty
Quadruple the normal permit fee

Summary

In the City of Medford, Massachusetts, installing a residential swimming pool requires a building permit under Section 10-35, priced at $15.00 per $1,000 of construction cost plus a $35.00 application fee, and a simultaneous electrical permit under Section 10-67 costing $75.00 for an inground pool or $50.00 for an above-ground unit.

Sec. 10-35. - Building permit and inspection fees. The building permit and inspection fees are included in appendix A of these Revised Ordinances. ... (c)Electrical permit applications for siding and pools must be submitted simultaneously with building permit applications. ... (1) Permit fees for new building; additions; alterations; and repairs: per $1,000.00 of estimated construction cost ..... 15.00 Application fee ..... 35.00 ... (14) Other permit fees: a. Swimming pools inground ..... 75.00 Above-ground (portable units) ..... 50.00 ... 4.A swimming pool must be set back a minimum six feet from rear and side lot lines measured from the water's edge to the lot lines, and a minimum setback of 12 feet from the lot lines for any type of pump equipment.

Full Breakdown

Medford's building code, Chapter 10 of the Revised Ordinances, treats a swimming pool as a structure requiring the same building permit process as any new construction. Section 10-35 sends applicants to the Appendix A fee schedule, where the general building permit fee is $15.00 per $1,000.00 of estimated construction cost plus a $35.00 application fee, calculated on the cost of installing the pool. Section 10-67(c) then requires that electrical permit applications for siding and pools be submitted simultaneously with building permit applications, meaning a homeowner cannot wait until construction is underway to add the electrical permit for pool bonding and equipment.

That electrical permit carries its own flat fee in Appendix A: $75.00 for an inground pool and $50.00 for an above-ground, portable unit. Once installed, the accessory structure standards in Section 94-4.3.2 require the pool itself to sit back at least six feet from the rear and side lot lines, measured from the water's edge, and require any pump equipment to sit back at least 12 feet from those same lot lines. The building commissioner reviews and issues both permits, and Section 10-67(a) adds that electrical work performed without notifying the superintendent of wires is subject to a separate $20.00 fine.

Starting pool construction without a building permit quadruples the normal permit fee under Appendix A's building fee schedule, a penalty that applies equally to pool work begun before permits are pulled.

Violations & Fines

Starting pool construction without a building permit quadruples the normal building permit fee under the Appendix A fee schedule. Failing to submit the required electrical permit for the pool at the same time as the building permit, per Section 10-67(c), or wiring the pool without notifying the superintendent of wires under Section 10-67(a), can draw a separate $20.00 fine plus reinspection charges.

Frequently Asked Questions

Do I need a separate electrical permit for a pool in Medford?
Yes. Section 10-67(c) of the Medford Revised Ordinances requires that electrical permit applications for pools be submitted simultaneously with the building permit application, not afterward. The electrical permit itself costs $75.00 for an inground pool or $50.00 for an above-ground portable unit, set out in the Appendix A fee schedule.
How much does a residential pool building permit cost in Medford?
The general building permit fee in Appendix A applies: $15.00 per $1,000.00 of the pool's estimated construction cost, plus a flat $35.00 application fee. This is the same formula used for any new construction, addition or alteration under Section 10-35.
How far from my property line must a pool be in Medford?
Section 94-4.3.2 of the zoning ordinance requires a swimming pool to sit back at least six feet from the rear and side lot lines, measured from the water's edge, and requires a 12-foot setback from the lot lines for any pump equipment associated with the pool.

Sources & Official References

Other rules in Medford

All Medford rules

Compare Medford to another location·View the Massachusetts swimming pools & spas overview

Get notified when Pool Permits in Medford, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.