Ridgewood, NJ Swimming Pools & Spas: Pool Permits (2026)
Swimming pool permit rules in Ridgewood, NJ, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.
Key Facts
- Above-ground pool permit fee
- $110
- In-ground pool permit fee
- $325
- Pool barrier/fence permit (>6 ft)
- $125
- Fee due
- Before permit is issued
- Enforcing agency
- Dept. of Building and Inspections
- Appeals go to
- Construction Board of Appeals
Summary
The Village of Ridgewood, Bergen County, requires a construction permit before building a residential swimming pool. The Department of Building and Inspections charges $110 for an above-ground pool and $325 for an in-ground pool, due before the permit issues.
The fee for a construction permit and other related permits shall be as set forth in Chapter 145, Fees, and shall be paid before the permit is issued. ... For swimming pools, the fee shall be: (a) Aboveground pool, $110. (b) In-ground pool, $325. (c) Swimming pool barriers and fences greater than six feet in height, $125.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4854397; v35 updated 2026-04-22; through 04-22-2026).
Full Breakdown
Under the Uniform Construction Code as administered locally, Village of Ridgewood Code § 125-3(A) requires that the fee for a construction permit and related permits be paid before the Construction Official's office issues the permit. Chapter 145's fee enumeration, § 145-6, sets the actual dollar figures collected under that authority: an above-ground pool permit costs $110, an in-ground pool permit costs $325, and a permit for swimming pool barriers or fences taller than six feet costs an additional $125. Because a residential pool touches more than one subcode, homeowners also pay separately for electrical work on pool, spa, or hot tub wiring and bonding, and for the plumbing subcode permit covering the pool's water supply and drain connections, both billed on their own line items in the same § 145-6 schedule.
The Building Subcode Official and other subcode officials named in § 125-1(A) review and inspect the work; plan review, when required, is credited toward the final construction permit fee under § 125-3(B). If the Construction Official denies or conditions a permit, the applicant can appeal to the Construction Board of Appeals established under § 125-2(A), a five-member board that includes a licensed architect or engineer and members qualified as plumbing and electrical subcode officials. Applicants should expect the pool permit, the barrier/fence permit if the fence exceeds six feet, and the related electrical and plumbing subcode permits to be filed and paid together before any digging or installation begins, since the Department will not issue the construction permit until its associated fee is paid in full.
Violations & Fines
Building a pool without the required construction permit exposes the owner to stop-work action and enforcement by the Department of Building and Inspections, and the Village can withhold a certificate of approval for the pool until the permit, barrier/fence permit, and any related electrical and plumbing subcode permits are obtained and their fees paid retroactively, in addition to normal permit fees.
Frequently Asked Questions
Do I need a permit for an above-ground pool in Ridgewood?
How much does an in-ground pool permit cost?
Does my pool fence need its own permit?
Who do I appeal to if my pool permit is denied?
Sources & Official References
Other rules in Ridgewood
Compare Ridgewood to another location·View the New Jersey swimming pools & spas overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.