Spokane Valley, WA Swimming Pools & Spas: Pool Permits (2026)
Swimming pool permit rules in Spokane Valley, WA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.
Key Facts
- Governing section
- SVMC § 19.65.180(B)
- Pool wall setback
- 5 ft from side/rear lines
- Front yard rule
- Pool must sit behind setback
- Permit authority
- SVMC Title 24 building code
- Excavation requirement
- Temporary fencing required
- Unpermitted work penalty
- Investigation fee equals permit fee
Summary
Spokane Valley requires every in-ground swimming pool to sit behind the front yard setback line and at least five feet from every other property line, and the pool must be secured to the standards of SVMC Title 24, the city's adopted building code. Temporary fencing has to go up before excavation starts, ahead of the permanent barrier fence required once the pool is built.
In-Ground Swimming Pool. The vertical wall of all in-ground swimming pools shall be located behind the front yard setback and at least five feet from all other property lines. All pools shall be secured in accordance with the requirements of SVMC Title 24. Temporary fencing is required during excavation.
Full Breakdown
180(B) governs residential pools under the zoning code's 'Uncategorized uses' section. The vertical wall of the pool shell has to sit entirely behind the required front yard setback for the zone and keep at least five feet of clearance from every other property line, side or rear. 010. Permits are not optional, since Title 24's definition of 'structure' already lists swimming pools among the improvements that trigger review. 180(B) requires temporary fencing around the open pit, a life-safety measure independent of whatever permanent pool barrier the adopted residential code later requires around the finished pool. 70-1, and keep the excavation fenced until the deck and permanent barrier are in place.
Violations & Fines
Building without a permit is not a technicality here: SVMC § 24.40.030(B)(5) makes anyone who starts pool construction before the permit issues liable for an investigation fee equal to the permit fee itself, on top of that fee, whether or not the City ultimately grants the permit. Zoning and building violations more broadly run through SVMC Chapter 17.100, which lets code compliance issue a notice and order, assess civil penalties, and order a stop-work order until the violation is corrected.
Frequently Asked Questions
Do I need a permit to build an in-ground pool in Spokane Valley?
How far from my property line does the pool have to be?
What happens if I start digging before the permit is approved?
Sources & Official References
Other rules in Spokane Valley
Compare Spokane Valley to another location·View the Washington swimming pools & spas overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.